Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
River Ridge Add-CS 940311
_ Coppell, Texas 75019 he City With A Beautiful Future 214-462-0022 March 11, 1994 Mr. John Skinner Patco Utilities, Inc. 1617 W. Highway 303 Grand Prairie, TX 75051 RE: River Ridge Addition Dear Mr. Skinner: In accordance with your request, inspection service was provided by the City of Coppell Engineering Department at the referenced location on Saturday, March 5, 1994. The overtime rate including salary and benefits is $29.00 per hour. Seven hours were charged to your company on that date. Please send a check for $203.00 payable to the City of Coppell to the following address: City of Coppell Finance Department P.O. Box 478 Coppell, TX 75019 Attention: Alan Johnson If you should have any questions, please contact me at (214) 393-1016. Sin~ ~~~..~ Larry Davis Construction Inspector cc: Finance Department Doug Stevens, Engineering Technician file/orr. Itt PATCO UTILITIES, INC. 1617 W. Highwa~ 303 Grand Prairie, Texns 75051 (214) 641-7901 MarcP, 3, 1994 City ,-,f ti:,-,ppell Engineering Dept ct,_, Mr, I._a'rry Davis Dear E;ir: PAT~Z:O Utilities requests in~p=-rt~.:.n on Saturday, Mar. 5, 1994. We will cancel by -4.:0© F'M on F~-~day ~hould weather or other factor~ make this impossible. W~ :-~alize there w~ll be a =i;:i=u,T, .?~ 4 h~s charged at overtime ra~e for this ser'~'!c~.