Loading...
River Ridge Add-CS 940308March 8, 1994 Mr. John Skinner Patco Utilities 1617 W. Highway 303 Grand Prairie, Texas 75051 Re: River Ridge Addition Dear Mr. Skinner: In accordance with your request, inspection service was provided by the City of Coppell Engineering Department at the referenced locations on Saturday, February 26, 1994. The overtime rate including salary and benefits is $26.00 per hour. Four hours were charged to your company on that date. Please send a check for $104.00 payable to the City of Coppell to the following address: City of Coppell Finance Department P.O. Box 478 Coppell, TX 75019 Attention: Alan Johnson If you should have any questions, please contact me at (214) 393-1016. Sincerely, Construction Inspector cc: Doug Stevens, Engineering Technician Finance Department file/ovt.ltr PATCO UTILITIES. INC. 1617 W. Highway 303 Grand Prairie, Texas 75061 (214) 641-7~01 February 24, 1994 City ~f Coppell Engineering Dept c/c. Mr. Lar~y Davis Dear Sir: PATCO Utilities requests inspection on Saturday~ Feb. 26, 1994. We will cancel by 4:00 PM on Friday should weather or other factors make this impossible. We realize there will be a minimum of 4 hfs charged at the overtime ratm fo~ this service. Thank you, Jo~hn Skinne~~r