River Ridge Add-CS 940308March 8, 1994
Mr. John Skinner
Patco Utilities
1617 W. Highway 303
Grand Prairie, Texas 75051
Re: River Ridge Addition
Dear Mr. Skinner:
In accordance with your request, inspection service was provided by the City of Coppell
Engineering Department at the referenced locations on Saturday, February 26, 1994. The
overtime rate including salary and benefits is $26.00 per hour. Four hours were charged to your
company on that date.
Please send a check for $104.00 payable to the City of Coppell to the following address:
City of Coppell
Finance Department
P.O. Box 478
Coppell, TX 75019
Attention: Alan Johnson
If you should have any questions, please contact me at (214) 393-1016.
Sincerely,
Construction Inspector
cc: Doug Stevens, Engineering Technician
Finance Department
file/ovt.ltr
PATCO UTILITIES. INC.
1617 W. Highway 303
Grand Prairie, Texas 75061
(214) 641-7~01
February 24, 1994
City ~f Coppell
Engineering Dept
c/c. Mr. Lar~y Davis
Dear Sir:
PATCO Utilities requests inspection on Saturday~ Feb. 26,
1994.
We will cancel by 4:00 PM on Friday should weather or other
factors make this impossible.
We realize there will be a minimum of 4 hfs charged at the
overtime ratm fo~ this service.
Thank you,
Jo~hn Skinne~~r