River Ridge Add-CS 940225 P.O. Box 478
Coppell, Texas 75019
The City With A Beautiful Future 214-462-0022
February 25, 1994
Mr. John Skinner
Patco Utilities, Inc.
1617 W. Highway 303
Grand Prairie, TX 75051
RE: River Ridge Addition
Dear Mr. Skinner:
In accordance with your request, inspection service was provided by the City of Coppell
Engineering Department at the referenced location on Saturday, February 19, 1994. The
overtime rate including salary and benefits is $29.00 per hour. Four hours were charged to your
company on that date.
Please send a cheek for $116.00 payable to the City of Coppell to the following address:
City of Coppell
Finance Department
P.O. Box 478
Coppell, TX 75019
Attention: Alan lohnson
If you should have any questions, please contact me at (214) 393-1016.
Larry Davis
Construction Inspector
cc: Finance Department
Doug Stevens, Engineering Technician
file/ovt.ltr
PATCO U~L~iE~, ~C.
1617 W. Highw~ 3~
Gr~nd Prairie, Texas 75~
(214) ~-7~!
February 17, 1994
City of Coppell
En~inee~in~ Dept
¢/o Mr. Larry Davis
Dear ~ir:
PATCO Utilities requests inspection on 8&~:urd&y~ Feb. 19,
1994.
Wa will cancel by 4100 PM on Friday should weather or other
factor~ make thi~ imgos~ible.
We realize there will be a minimum of 4 hfs charged at ~he
overtime rate fo~ this mervice.
Thank you,