Loading...
River Ridge Add-CS 940225 P.O. Box 478 Coppell, Texas 75019 The City With A Beautiful Future 214-462-0022 February 25, 1994 Mr. John Skinner Patco Utilities, Inc. 1617 W. Highway 303 Grand Prairie, TX 75051 RE: River Ridge Addition Dear Mr. Skinner: In accordance with your request, inspection service was provided by the City of Coppell Engineering Department at the referenced location on Saturday, February 19, 1994. The overtime rate including salary and benefits is $29.00 per hour. Four hours were charged to your company on that date. Please send a cheek for $116.00 payable to the City of Coppell to the following address: City of Coppell Finance Department P.O. Box 478 Coppell, TX 75019 Attention: Alan lohnson If you should have any questions, please contact me at (214) 393-1016. Larry Davis Construction Inspector cc: Finance Department Doug Stevens, Engineering Technician file/ovt.ltr PATCO U~L~iE~, ~C. 1617 W. Highw~ 3~ Gr~nd Prairie, Texas 75~ (214) ~-7~! February 17, 1994 City of Coppell En~inee~in~ Dept ¢/o Mr. Larry Davis Dear ~ir: PATCO Utilities requests inspection on 8&~:urd&y~ Feb. 19, 1994. Wa will cancel by 4100 PM on Friday should weather or other factor~ make thi~ imgos~ible. We realize there will be a minimum of 4 hfs charged at ~he overtime rate fo~ this mervice. Thank you,