River Ridge Add-CS 940211_ Coppell, Texas 75019
The City With A Beautiful Future 214-462-0022
February 11, 1994
Mr. John Skinner
Parco Utilities, Inc.
1617 W. Highway 303
Grand Prairie, Texas 75051
RE: River Ridge Addition
Dear Mr. Skinner:
In accordance with your request, inspection service was provided by the City of Coppell
Engineering Department at the referenced location on Saturday, February 5, 1994. The
overtime rate including salary and benefits is $29.00 per hour. Six hours were charged to your
company on that date.
Please send a check for $174.00 payable to the City of Coppell to the following address:
City of Coppell
Finance Department
P.O. Box 478
Coppell, TX 75019
Attention: Alan Johnson
If you should have any questions, please contact me at (214) 393-1016.
~ Davis
Construction Inspector
cc: Finance Department
Doug Stevens, Engineering Technician
file/ovt.ltr
FEB 03 '94 0~:5~P~ ~ ..... P.1/:
PATCO UTILfflES, INC.
1617 w. Highwa~ 303
Grand Prairie, Texas 750~!
(2~4) 641-7901
Februa,¥ 3~1~94
City of Coppe11
EnGineering Dept
c/o ~r. Larry Davis
PATCO Utilities requests inspection on Saturday, Feb, 5,
1994.
We will cancel by 4:00 PM on Friday should weather or other
factors aake this i~possible.
We realize there will be a minimum of 4 hfs cha~§ed at the
overtime ~ate for this service.