Loading...
River Ridge Add-CS 940211_ Coppell, Texas 75019 The City With A Beautiful Future 214-462-0022 February 11, 1994 Mr. John Skinner Parco Utilities, Inc. 1617 W. Highway 303 Grand Prairie, Texas 75051 RE: River Ridge Addition Dear Mr. Skinner: In accordance with your request, inspection service was provided by the City of Coppell Engineering Department at the referenced location on Saturday, February 5, 1994. The overtime rate including salary and benefits is $29.00 per hour. Six hours were charged to your company on that date. Please send a check for $174.00 payable to the City of Coppell to the following address: City of Coppell Finance Department P.O. Box 478 Coppell, TX 75019 Attention: Alan Johnson If you should have any questions, please contact me at (214) 393-1016. ~ Davis Construction Inspector cc: Finance Department Doug Stevens, Engineering Technician file/ovt.ltr FEB 03 '94 0~:5~P~ ~ ..... P.1/: PATCO UTILfflES, INC. 1617 w. Highwa~ 303 Grand Prairie, Texas 750~! (2~4) 641-7901 Februa,¥ 3~1~94 City of Coppe11 EnGineering Dept c/o ~r. Larry Davis PATCO Utilities requests inspection on Saturday, Feb, 5, 1994. We will cancel by 4:00 PM on Friday should weather or other factors aake this i~possible. We realize there will be a minimum of 4 hfs cha~§ed at the overtime ~ate for this service.