River Ridge Add-CS 940124Januar~ 24, 1994
Mr. John Skinner
Parco Utilities, ~¢.
1617 W. Highway 303
Grand Prairie, TX 75051
RE: River Ridge Addition
Dear Mr. Skinner:
In accordance with your request, inspection service was provided by the City of Coppell
Eagineering Department at the referenced location on Saturday, January 22, 1994. The overtime
rate including salary and benefits is $29.00 per hour. Four hours were charged to your company
on that date.
Please send a check for $116.00 payable to the City of Coppell to the following address:
City of Copper
Finance Department
P.O. Box 478
Coppell, TX 75019
Attention: Alan Johnson
If you should have any questions, please contact me at (214) 393-1016.
Construction Inspector
cc: Finance Department
Doug Stevens, Engineering Technician
file/ovt.ltr
JA~ 18 '94 05:31PM 5"
.. . ~.~ P. 1/:
PATCO UTILITIES, INC.
Grand Praise, Texas 75051
(2t4) 641-7~ I
City of Coppell
Engineering Dept
¢/o Mr. Larry Davis
Dear
PATCO Utilities requests inspection on Saturday, Jan. 22,
1994.
We wi. il cancel by ~:00 PM on Friday ~Moul~ wmathe~ or other
factors make this impossible.
We realize the~e will b~ a minimum ,~f 4 MrS charged a~ ~he
,~,vertime ra~e fo~ this servi,ze.
Thank you,