Loading...
River Ridge Add-CS 931215 P.O. Box 478 Coppell, Texas 75019 The City With A Beautiful Future 214-462-0022 December 15, 1993 Mr. Jeff Crandall CCM Engineering Corporation. 1120 Empire Central Place Suite 308 Dallas, TX 75247 RE: River Ridge Addition Development Fee Assessment Dear Mr. Crandall: Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of the development fee calculations for River Ridge Addition. Please provide a check made payable to the City of Coppell in the amount of $82,705.03 and forward it to Mr. Alan Johnson, Acting Finance Director, along with a copy of the fee assessment list. Please provide our office a copy of the Engineer's Estimate or contract for this project so the construction inspection fee can be verified. Please provide a copy of your paid receipt to our offices. Copies of your receipts will help us verify payment of the required fees and assure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please do not hesitate to contact me. Sincerely, Kenneth M. Griffin, P.E. City Engineer cc: Steve Goram, Director of Public Works Alan Johnson, Acting Finance Director Greg Jones, Building Official Doug Stevens, Engineering Technician CITY OF COPPELL DEVELOPMENT FEES Date: December 15, 1~3 Project: River Ridge Addition AMOUNT DUE PRIOR TO TOTAL COUNCIL ASSESSMENT APPROVAL Water Impact Fee $ 43,255.00 $ 43,255.00 (100% due prior to Council Approval) Water Tap Inspection Fee $ 6,500.00 -0- (100%due at Issuance of Building Permit) Wastewater Impact Fee $ 27,450.00 $ 27,450.00 (100% duc prior to Council Approval) Sewer Tap Inspection Fee $ 6,100.00 -0- (100%due at Issuance of Building Permi0 Utility Final Inspection Fee $ 3,050.00 -0- (100%due at Issuance of Building Permi0 Water Meter Fee (Lots) $1,357.25 -0- (100%due at Issuance of Building Permi0 Water Meter Fee (Irrigation) $ 186.30 -0- (100%due at Issuance of Water Meters) Water Meter Deposit $ 1,830.00 -0- (100%due at Issuance of Building Permi0 Irrigation Meter Deposit $ 140.00 -0- (100%due at Issuance of Water Meters) Street Sign Fee $ 1,325.03 $ 1,325.03 (100%due prior to Acceptance of Projec0 Street Light Fee * * (100%due prior to Acceptance of Projec0 Park Fee - $ 21,350.00 $' 10,675.00 (50% due prior to Council Approval) (50%duc prior to Issuance of Building Permi0 TOTAL $112,543.58 $ 82,705.03 TOTAL AMOUNT DUE PRIOR TO $82,705.03 COUNCIL APPROVAL + Construction Inspection Fee (2 % of Project Cost due prior to preconstrucfion meeting) * This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once the plan is submitted, $292.60 per light will be assessed. COPPELL PUBLIC WORKS MEMORANDUM DATE: 12/8/93 TO: Ken Griffin, City Enginee~ O FROM: Public Works Staff~l~~ RE: Development Fees for River Ridge Addition The following fees should be assessed and collected on the above referenced project. Water Impact Fee: 61 - 5/8" x 3/4" Domestic Meter/s = 61 ESU's 3 - 5/8" x 3/4" Irrigation Meter/s = 3 ESU's 1 - 1" Irrigation/Meter/s = 2.5 ESU's Total 66.5 ESU's @ $650.00 ea = $43,225.00 100% due prior to Council approval of the final plat. Wastewater Impact (city) 61 - 5/8" x 3/4" Residential Meters = 61 ESU's Total 61 ESU's @ $450.00 ea = $27,450.00 100% due prior to Council approval of the final plat. Water Tap Inspection Fee 65 Connections @ $100.00 each = $6,500.00 100% due prior to issuance of building permit. (Or in the case of the irrigation meter-prior to issuance of meter). Sewer Tap Inspection Fee 61 Connections @ $100.00 each = $6,100.00 100% due prior to issuance of building permit. Development Fees Page 2 Utility Final Inspection Fee 61 lots @ $50.00/lot = 53,050.00 100% due prior to issuance of building permit. Water Meter Fee (Lots) 61 - 5/8" x 3/4" Residential Meters @ 522.25 ea = 5 1,357.25 100% due prior to issuance of building permit. Water Meter Fee (Irrigation) 3 - 5/8" x 3/4" Irrigation Meters @ $22.25 ea = $ 66.75 1 - 1" Irrigation Meter @ $62.10 ea = 5 62.10 Total $186.30 100% due prior to issuance of water meters. Water Meter Deposit Residential - 61 meters @ $30.00 ea = 5 1,830.00 100% due prior to issuance of building permit. Irrigation 4 meters @ $35.00 ea = 5 140.00 100% due prior to issuance of water meters. Street Lighting Fee Shall be assessed and paid prior to final acceptance of project. Note: This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once plan is submitted $292.60 per light will be assessed. Development Fees Page 3 Street Signs Fee See attached Street Sign Assessment sheet. 100% due prior to final acceptance of project. Park Fee Residential Lots at $150.00 each = $ Units (Multi family) at $75.00 each = $ For those developments having preliminary plat approval prior to June 23, 1992 the following assessment is determined: 50% of the amount specified above shall be paid by the Developer; prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. For those developments having preliminary plat approval after June 23, 1992 the following assessment is determined: 61 Residential Lots at $350.00 each = $21,350.00 units (Multi-Family) at $350.00 each = $ 50% of the amount specified above shall be paid by the Developer prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. Please advise the Developer of these fees and due dates. If you have any questions regarding these assessments please advise. HLP/dm cc: Steven G. Goram Director of Public Works DEVFEES.HLP Development Fees Page 4 STREET SIGN ASSESSMENT for River Ridge Addition The following assessment is being made in accordance with the City of Coppell Subdivision Ordinance Appendix A Chapter VIII A. The following cost of those sign materials required are based on current pricing which is reviewed on a regular basis. SIGN UNIT PRICE OUANTITY EXTENDED PRICE No Parking $53.10 Speed Limit $63.54 11 $698.94 Yield $58.56 Stop $65.12 Street Name $11.60 Stop & Street Combo $96.85 5 484.25 OTHER No Outlet ~30") $65.12 2 130.24 No Outlet Blade $11.60 1 11.60 TOTAL 19 $1.325.03 * Cost breakdowns may be obtained from Public Works by written request. DEVFEES.HLP Revised 12/15/92