River Ridge Add-CS 931215 P.O. Box 478
Coppell, Texas 75019
The City With A Beautiful Future 214-462-0022
December 15, 1993
Mr. Jeff Crandall
CCM Engineering Corporation.
1120 Empire Central Place
Suite 308
Dallas, TX 75247
RE: River Ridge Addition
Development Fee Assessment
Dear Mr. Crandall:
Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy
of the development fee calculations for River Ridge Addition.
Please provide a check made payable to the City of Coppell in the amount of $82,705.03 and
forward it to Mr. Alan Johnson, Acting Finance Director, along with a copy of the fee
assessment list. Please provide our office a copy of the Engineer's Estimate or contract for this
project so the construction inspection fee can be verified.
Please provide a copy of your paid receipt to our offices. Copies of your receipts will help us
verify payment of the required fees and assure a successful beginning of this project.
We look forward to working with you on this project. If you have any questions, please do not
hesitate to contact me.
Sincerely,
Kenneth M. Griffin, P.E.
City Engineer
cc: Steve Goram, Director of Public Works
Alan Johnson, Acting Finance Director
Greg Jones, Building Official
Doug Stevens, Engineering Technician
CITY OF COPPELL
DEVELOPMENT FEES
Date: December 15, 1~3
Project: River Ridge Addition
AMOUNT DUE
PRIOR TO
TOTAL COUNCIL
ASSESSMENT APPROVAL
Water Impact Fee $ 43,255.00 $ 43,255.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $ 6,500.00 -0-
(100%due at Issuance of Building Permit)
Wastewater Impact Fee $ 27,450.00 $ 27,450.00
(100% duc prior to Council Approval)
Sewer Tap Inspection Fee $ 6,100.00 -0-
(100%due at Issuance of Building Permi0
Utility Final Inspection Fee $ 3,050.00 -0-
(100%due at Issuance of Building Permi0
Water Meter Fee (Lots) $1,357.25 -0-
(100%due at Issuance of Building Permi0
Water Meter Fee (Irrigation) $ 186.30 -0-
(100%due at Issuance of Water Meters)
Water Meter Deposit $ 1,830.00 -0-
(100%due at Issuance of Building Permi0
Irrigation Meter Deposit $ 140.00 -0-
(100%due at Issuance of Water Meters)
Street Sign Fee $ 1,325.03 $ 1,325.03
(100%due prior to Acceptance of Projec0
Street Light Fee * *
(100%due prior to Acceptance of Projec0
Park Fee - $ 21,350.00 $' 10,675.00
(50% due prior to Council Approval)
(50%duc prior to Issuance of Building Permi0
TOTAL $112,543.58 $ 82,705.03
TOTAL AMOUNT DUE PRIOR TO $82,705.03
COUNCIL APPROVAL
+ Construction Inspection Fee
(2 % of Project Cost due prior to
preconstrucfion meeting)
* This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project.
Once the plan is submitted, $292.60 per light will be assessed.
COPPELL PUBLIC WORKS
MEMORANDUM
DATE: 12/8/93
TO: Ken Griffin, City Enginee~ O
FROM: Public Works Staff~l~~
RE: Development Fees for River Ridge Addition
The following fees should be assessed and collected on the above
referenced project.
Water Impact Fee:
61 - 5/8" x 3/4" Domestic Meter/s = 61 ESU's
3 - 5/8" x 3/4" Irrigation Meter/s = 3 ESU's
1 - 1" Irrigation/Meter/s = 2.5 ESU's
Total 66.5 ESU's @ $650.00 ea = $43,225.00
100% due prior to Council approval of the final plat.
Wastewater Impact (city)
61 - 5/8" x 3/4" Residential Meters = 61 ESU's
Total 61 ESU's @ $450.00 ea = $27,450.00
100% due prior to Council approval of the final plat.
Water Tap Inspection Fee
65 Connections @ $100.00 each = $6,500.00
100% due prior to issuance of building permit. (Or in the case of
the irrigation meter-prior to issuance of meter).
Sewer Tap Inspection Fee
61 Connections @ $100.00 each = $6,100.00
100% due prior to issuance of building permit.
Development Fees
Page 2
Utility Final Inspection Fee
61 lots @ $50.00/lot = 53,050.00
100% due prior to issuance of building permit.
Water Meter Fee (Lots)
61 - 5/8" x 3/4" Residential Meters @ 522.25 ea = 5 1,357.25
100% due prior to issuance of building permit.
Water Meter Fee (Irrigation)
3 - 5/8" x 3/4" Irrigation Meters @ $22.25 ea = $ 66.75
1 - 1" Irrigation Meter @ $62.10 ea = 5 62.10
Total $186.30
100% due prior to issuance of water meters.
Water Meter Deposit
Residential - 61 meters @ $30.00 ea = 5 1,830.00
100% due prior to issuance of building permit.
Irrigation
4 meters @ $35.00 ea = 5 140.00
100% due prior to issuance of water meters.
Street Lighting Fee
Shall be assessed and paid prior to final acceptance of project.
Note: This fee cannot be assessed until after TU Electric
submits the lighting plan for the proposed project. Once
plan is submitted $292.60 per light will be assessed.
Development Fees
Page 3
Street Signs Fee
See attached Street Sign Assessment sheet.
100% due prior to final acceptance of project.
Park Fee
Residential Lots at $150.00 each = $
Units (Multi family) at $75.00 each = $
For those developments having preliminary plat approval prior to
June 23, 1992 the following assessment is determined:
50% of the amount specified above shall be paid by the Developer;
prior to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a
building permit is issued.
For those developments having preliminary plat approval after June
23, 1992 the following assessment is determined:
61 Residential Lots at $350.00 each = $21,350.00
units (Multi-Family) at $350.00 each = $
50% of the amount specified above shall be paid by the Developer
prior to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a
building permit is issued.
Please advise the Developer of these fees and due dates.
If you have any questions regarding these assessments please
advise.
HLP/dm
cc: Steven G. Goram
Director of Public Works
DEVFEES.HLP
Development Fees
Page 4
STREET SIGN ASSESSMENT
for River Ridge Addition
The following assessment is being made in accordance with the City
of Coppell Subdivision Ordinance Appendix A Chapter VIII A. The
following cost of those sign materials required are based on
current pricing which is reviewed on a regular basis.
SIGN UNIT PRICE OUANTITY EXTENDED PRICE
No Parking $53.10
Speed Limit $63.54 11 $698.94
Yield $58.56
Stop $65.12
Street Name $11.60
Stop & Street Combo $96.85 5 484.25
OTHER
No Outlet ~30") $65.12 2 130.24
No Outlet Blade $11.60 1 11.60
TOTAL 19 $1.325.03
* Cost breakdowns may be obtained from Public Works by written