Loading...
River Ridge Add-CS 931202 CCM JneerJng Corporal.on 1120 EMPIRE CENTRAL PLACE · SUITE #308 DALLAS, TEXAS 75247 (214) 630-5200 · FAX (214} 905-9393 December 2, 1993 Mr. Michael Martin City of Coppell Department of Public Works P.O. Box 478 Coppell, Texas 75019 Ref: River Ridge Addition Coppell, Texas Dear Mike, I re-submitted the engineering plans for the referenced addition this week. The revised plans included changes requested during the first review. The following is a list of the revisions as referenced to your review latter dated November 17, 1993: 1. The drainage plans include a detail showing how the storm water flows into the easement on the west. TU Electric owns the land to the west and they will not grant an easement. The design calls for a headwall to be constructed 5' off the property line and we will match existing grade at the base of the headwall. 2. Water and sewer services are shown to all lots. Blow off valves are shown at the ends of water lines in the cul-de-sacs Bores are shown to be dry bores General noted were revised as shown on the plan 3. All water line crossing are now shown on the sewer profiles. Crossings with less than 2' of separation show concrete encasement. 4. Paving plans now show curb radii on all curves. Widths of right-of-way and cul-de-sac dimensions are now shown. 5. Typical alley configurations are now shown and a general note was added referring to the cities standard details for alley construction. 6-. ADA ramps are shown at all street intersections and noted. 7. Drainage flow arrows are now shown on the paving plans and a general note was added referring to the drainage plan for overall storm drainage information. 8. A correction to one flow arrow on the drainage plan was made to properly indicate the surface drainage. 9. A) Sheet 8 now has a detail showing the outfall of the storm sewer pipe and its headwall. B) We have received verbal approval for revising the drainage easement through the golf course property and a final easement document has been prepared. C) A note was added about contacting the golf course representative prior to construction. D) A note was added about replacing grass sod and repairing irrigation systems within the golf course upon completion of the storm sewer pipe. E) All storm sewer lines are in partial flow as indicated on the profiles. 10. TU Electric will not grant a drainage easement into its power line easement. We have located the storm sewer headwall off the property line 5' to allow for construction of the headwall totally within our property. The TU easement is totally within a designated floodplain. 11. Underground sleeves for TU Electric, cable and GTE conduits are now shown on the paving plans. Please review the engineering plans and contact this office if you have any questions or need additional information. Sincerely, Jeff D. Crannell, P.E. Pres., CCM Engineering Corp. JDC/lc cc: RBR Properties, Bobby Rollings