Loading...
SC-Coppell ABA-LR010122FUGRO SOUTH, INC. �GRO 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT Coppell ISD, c/o K A Sparks Report Date January 22, 2001 PROJECT Coppell ISD Administration Building, Coppell, Texas Project No .: 0700 -2189 SAMPLE DATE: January 12, 2001 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. ( °F) (ASTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: The Cortez Group 7097081 CONCRETE SUPPLIER: LMC 44 PLANT/TRUCK: 7 -938 50 MIX ID NUMBER: 39 8:38 A.M. AIR ( % ) (ASTM C -231) : - 9:25 A.M. WATER ADDED (gal): - Cloudy SLUMP (in.) (ASTM C -143) : 53/4 Paving on sidewalk on south side of the building (next to building). CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CAC 35 7 1 -19 -01 109600 3880 3500/28 days CAC 36 28 2 -9 -01 CAC 37 28 2 -9 -01 CAC 38 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C -31 Testing ASTM C -143, Types of 1 Fracture: ® a Curing: Methods: ASTM C -39 A C D B REMARKS: Technician: Dumitru Balas FUGRO SOUTH INC. c ' Reviewed By: SMH/ nl Distribution: K A Sparks Contractors Inc. — Jim Schooler City of Coppell — Larry Davis Coppell ISD — Mickey Harper SHW Group — Joe Craddock SHW Group — Mike Elmore