Loading...
SC-Coppell ABA-LR001013a m FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT Coppell ISD, c/o K A Sparks Report Date October 13, 2000 PROJECT Coppell ISD Administration Building, Coppell, Texas Project No.: 0700 -2189 SAMPLE DATE: August 17, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C- 1064) TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: K. A. Sparks 3110587 CONCRETE SUPPLIER: LMC 88 PLANTITRUCK: 3/1050 90 MIX ID NUMBER: 39 8:37 AIR ( %) (ASTM C -231) : 2620 9:20 WATER ADDED (gal): 0 Clear SLUMP (in .) (ASTM C -143) : 5.50 Paving: Parking area, 50 feet north of southeast corner, 30 feet east of building 28 09/14/00 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches CYLINDER NUMBER AGE (days) DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE STRENGTH (psi) SPECIFIED COMPRESSIVE STRENGTH (psi) CAC 14 5 08122/00 74100 2620 3500/28 days CAC 15 7 08/24/00 78100 2770 CAC 16 28 09/14/00 93500 3310' CAC 17 28 09/14/00 91200 3230* CAC 18 56 1 10/12/00 101700 3600 Specifications: Making & ASTM G-31 Curing: - Testing ASTM C -143, � Methods: ASTM C -39 Fracture mode is (A) unless otherwise noted Types of Fracture: A® B® CZ D REMARKS: *Does not meet required compressive strength at 28 days. Technician: Bob Shea FUGRO SOUTH INC. C ' Reviewed By: SMH /bg Distribution: K A Sparks Contractors Inc. - Jim Schooler City of Coppell — Larry Davis Coppell ISD — Mickey Harper SHW Group — Joe Craddock SHW Group — Mike Elmore