Loading...
SC-Coppell ABA-LR001011FUGRO SOUTH, INC. a m 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT Coppell ISD, c/o K A Sparks Report Date October 11, 2000 PROJECT Coppell Middle School West, Coppell, Texas Project No.: 0700 -2227 SAMPLE DATE: October 2, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. ( °F): CONCRETE TEMP. ( °F) (ASTM C•1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Corez Group 7093423 CONCRETE SUPPLIER: Lattimore 71 PLANT/TRUCK: 7/755 76 MIX ID NUMBER: CYLINDER 7:47 AIR (% ) (ASTM C -231) : 4.5 8:25 WATER ADDED (gal): NUMBER clear SLUMP (in .) (ASTM C -143) : 5 North end of east parking lots, south lane (psi) CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6 x 12 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CMW 53 7 10 -9 -00 72400 2560 3000/28 days CMW 54 28 10 -30 -00 CMW 55 28 10 -30 -00 CMW 56 Hold Fracture mode is (A) unless otherwise noted Specifications: & ASTM G31 ® ® Curing: Methods: ASTM C -39 Fracture: A B C D REMARKS: Technician: Jerry Smith FUGRO SOUTH INC. Reviewed By: SMH /kp Distribution: K A Sparks Contractors Inc. — Jim Schooler City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell ISD - Mickey Harper SHW Goup — Mike Elmore SHW Goup — Joe Craddock FUGRO SOUTH, INC. hQ m 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD, c/o K A Sparks Report Date: October 11, 2000 PROJECT: Coppell Middle School West, Coppell, Texas Project No.: 0700 -2227 SAMPLE DATE: October 2, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. ( °F): CONCRETE TEMP. ( °F) (ASTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Corez Group 7093440 CONCRETE SUPPLIER: Lattimore 69 PLANT/TRUCK: 7/1044 72 MIX ID NUMBER: CYLINDER 6:07 AIR ( %) (ASTM C -231) : 4.0 6:40 WATER ADDED (gal): 5 clear SLUMP (in.) (ASTM C -143) : 4.5 North end of parking lot, north lane (psi) CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CMW 49 7 10 -9 -00 87900 3109 3000/28 days CMW 50 28 10 -30 -00 CMW 51 28 10 -30 -00 CMW 52 Hold Fracture mode is (A) unless othervvise noted Specifications: Making & ASTM C -31 Testing ASTM C -143, Types of Curing: Methods: ASTM C -39 Fracture: A® B® C D REMARKS: Technician Jerry Smith FUGRO SOUTH INC. Reviewed By: SMH /kp Distribution: K A Sparks Contractors Inc. — Jim Schooler City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell ISD - Mickey Harper SHW Goup — Mike Elmore SHW Goup — Joe Craddock FUGRO SOUTH, INC. ,0—� r - 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD, c/o K A Sparks Report Date: October 11 ,2000 PROJECT Coppell Middle School West, Coppell, Texas Project No .: 0700 -2227 SAMPLE DATE: September 29 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. ( °F): CONCRETE TEMP. ( °F) (ASTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Cortez Group 7093314 CONCRETE SUPPLIER: Lattimore 65 PLANT/TRUCK: 7/1040 72 MIX ID NUMBER: - 5:42 AIR ( % (ASTM C -231) : 4.7 6:30 WATER ADDED (gal): 0 clear SLUMP (in.) (ASTM C -143) : 6 North/ South walkway between the baseball & hardball field center CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CMW 45 7 10 -6 -00 106400 3760 3500/28 days CMW 46 28 10 -27 -00 CMW 47 28 10 -27 -00 CMW 48 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C -143, Types of Curing: Methods: ASTM C -39 Fracture: A® B® C D REMARKS: Technician: Jerry Smith FUGRO SOUTH INC. Reviewed By: C - -- SMH /nl Distribution: K A Sparks Contractors Inc. — Jim Schooler K A Sparks Contractors Inc. — Rick McKinney (Fax: 972 - 745 -4511) City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell ISD - Mickey Harper SHW Goup — Mike Elmore SHW Goup — Joe Craddock FUGRO SOUTH, INC. ' SRO 2880 Virgo Lane; Dallas, Texas 75229 Ph(972)484-8301; Fax(972)620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD, c/o K A Sparks Report Date: October 11, 2000 PROJECT: Coppell Middle School West, Coppell, Texas Project No.: 0700 -2227 SAMPLE DATE: September 28, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. ( °F): CONCRETE TEMP. ( °F) (ASTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Cortez Group 7093259 CONCRETE SUPPLIER: Lattimore 78 PLANT/TRUCK: 7/955 80 MIX ID NUMBER: - 8:25 AIR ( %) (ASTM C -231) : - 9:10 WATER ADDED (gal): 0 clear SLUMP (in.) (ASTM C -143) : 61/2 South End of North fire laine at enter section CMW 41 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CMW 41 7 10 -5 -00 71600 2530 3500/28 days CMW 42 28 10 -26 -00 CMW 43 28 10 -26 -00 CMW 44 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C -31 Testing ASTM C -143, C Types of Fracture: A® Curing: Methods: ASTM -39 BE CZ D REMARKS: Technician: Jerry Smith FUGRO SOUTH INC. Reviewed By: SMH /nl Distribution: K A Sparks Contractors Inc. — Jim Schooler K A Sparks Contractors Inc. — Rick McKinney (Fax: 972 - 745 -4511) City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell ISD - Mickey Harper SHW Goup — Mike Elmore SHW Goup — Joe Craddock FUGRO SOUTH, INC. 1.0�1. SRO 2880 Virgo Lane; Dallas, Texas 75229 Ph(972)484 -8301; Fax(972)620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD, c/o K A Sparks Report Date: October 11, 2000 PROJECT Coppell Middle School West, Coppell, Texas Project No .: 0700 -2227 SAMPLE DATE: September 28, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. ( °F) (ASTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Cortez Group 7093253 CONCRETE SUPPLIER: Lattimore 68 PLANT/TRUCK: 7/1045 72 MIX ID NUMBER: - 7:58 AIR ( % ) (ASTM C -231) : 4.5 8:30 WATER ADDED (gal): - clear SLUMP (in .) (ASTM C -143) : 61/2 North end of North fire lane (psi) CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square Inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CMW 37 7 10 -5 -00 81700 2890 /28 days CMW 38 28 10 -26 -00 CMW 39 28 10 -26 -00 CMW 40 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C -31 Testing ASTM C -143, Types of Fracture: Curing: Methods: ASTM C -39 A® B C D REMARKS: Technician: Jerry Smith FUGRO SOUTH INC. Reviewed By: G!� SMH /nl Distribution: K A Sparks Contractors Inc. — Jim Schooler K A Sparks Contractors Inc. — Rick McKinney (Fax: 972 - 745 -4511) City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell ISD - Mickey Harper SHW Goup — Mike Elmore SHW Goup — Joe Craddock SRO FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD, c/o K A Sparks Report Date: October 11, 2000 PROJECT: Coppell Middle School West, Coppell, Texas Project No.: 0700 -2227 SAMPLE DATE: September 28, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. ( °F) (ASTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches Lattimore 58 PLANT/TRUCK: TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CMW 33 7 10 -5 -00 71600 2530 3500/28 days CMW 34 28 10 -26 -00 CMW 35 28 10 -26 -00 CMW 36 Hold Fracture mode is (A) unless otherwise noted Specifications: " Making & ASTM C -31 Testing ASTM C -143, Types of Fracture: Curing: I Methods: ASTM C -39 A® BE CZ D Cortez Group 7093231 CONCRETE SUPPLIER: Lattimore 58 PLANT/TRUCK: 7/1045 66 MIX ID NUMBER: 5:51 AIR ( %) (ASTM C -231) : 4.3 6:48 WATER ADDED (gal): clear SLUMP (in.) (ASTM C -143) : 6.25 Corner of north and south firelane REMARKS: Technician Jerry Smith FUGRO SOUTH INC. Reviewed By: SMH /kp Distribution K A Sparks Contractors Inc. — Jim Schooler K A Sparks Contractors Inc. — Rick McKinney (Fax: 972 - 745 -4511) City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell ISD - Mickey Harper SHW Goup — Mike Elmore SHW Goup — Joe Craddock