Loading...
SC-Coppell ABA-LR000922n FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD, c/o K A Sparks Report Date: September 22, 2000 PROJECT: Coppell ISD Administration Building, Coppell, Texas Project No.: 0700 -2189 SAMPLE DATE: August 23, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. ( °F): CONCRETE TEMP. ( °F) (ASTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: The Cortez Group 091404 CONCRETE SUPPLIER: Lattimore 100 PLANTITRUCK: 7/613 92 MIX ID NUMBER: 38 12:44 AIR ( %) (ASTM C -231) : LOAD 1:30 WATER ADDED (gal): 10 Sunny SLUMP (in.) (ASTM C443) : 4 Grade beam, grid lines 12 feet 11 inches north off of southeast comer of new expansion 7 08/20/00 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CAC 23 7 08/20/00 83600 2960 3000/28 days CAC 24 28 09 120 /00 112700 3990 CAC 25 28 09/20/00 114900 4070 CAC 26 Hold Fracture mode is (A) unless otherwise noted Specifications: & ASTM C -31 ® ® Curing: Methods: ASTM C -39 Fractu of A B CO D REMARKS: Technician: Sammy Roberts FUGRO SOUTH INC. Reviewed By: SMH /rm Distribution: - K A Sparks Contractors Inc. Jim Schooley City of Coppell — Larry Davis,,---- Coppell ISD — Mickey Harper SHW Group — Joe Craddock SHW Group — Mike Elmore