Loading...
SC-Coppell ABA-LR000918FUGRO SOUTH, INC. '""' in 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD, c/o K A Sparks Report Date: September 18, 2000 PROJECT: Coppell ISD Administration Building, Coppell, Texas Project No.: 0700 -2189 SAMPLE DATE: September 5, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. ( °F): CONCRETE TEMP. ( °F) (ASTM C -1064) TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: K. A. Sparks / The Cortez Group 3111818 CONCRETE SUPPLIER: LMC 89 PLANT/TRUCK: 3/1049 92 MIX ID NUMBER: 38 8:40 am AIR ( %) (ASTM C -231) : LOAD 9:55 am WATER ADDED (gal): 5 Sunny SLUMP (in.) (ASTM C -143) : 6 Slab for building addition southeast side, 10 feet north, 8 feet west CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 11 , 28.27 square Inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CAC 31 7 09/12/00 77000 2730 3000/28 days CAC 32 28 10/03/00 CAC 33 28 10 /03 /00 CAC 34 Hold Fracture mode is (A) unless othervAse noted Specifications: Making & ASTM C -31 Testing ASTM C -143, Types of 0 Z Curing: Methods: ASTM C-39 Fracture: A n B C D REMARKS: Technician: Yancey Bivings FUGRO SOUTH INC. Reviewed By: SMH /rm Distribution K A Sparks Contractors Inc. — Jim Schooler City of Coppell — Larry Davis Coppell ISD — Mickey Harper SHW Group — Joe Craddock SHW Group — Mike Elmore FUGRO SOUTH, INC. I�� SRO 2880 Virgo Lane; Dallas, Texas 75229 Ph(972)484 -8301: Fax(972)620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT Coppell ISD, c/o K A Sparks Report Date September 19, 2000 PROJECT Coppell ISD Administration Building, Coppell, Texas Project No .: 0700 -2189 SAMPLE DATE: August 21, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. ( °F): CONCRETE TEMP. ( °F) (ASTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Cortez Group 691282 CONCRETE SUPPLIER: Lattimore 99 PLANT1 TRUCK: 7/955 89 MIX ID NUMBER: 38 9:29 AIR ( %) (ASTM C -231) : LOAD 10:30 WATER ADDED (gal): 10 Sunny SLUMP (in .) (ASTM C -143) : 4.5 5 feet south off northeast comer of building (psi) CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CAC 19 7 08/28/00 89900 3180 3000/28 days CAC 20 28 09/18/00 109900 3890 CAC 21 28 09/18/00 110300 3900 CAC 22 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C -31 Testing ASTM C -143, Types of Curing: Methods: ASTM C -39 D Fracture: A® B® CZ REMARKS: Technician: Sammy Roberts FUGRO SOUTH INC. Reviewed By: SMH /rm Distribution: K A Sparks Contractors Inc. — Jim Schooler City of Coppell — Larry Davis Coppell ISD — Mickey Harper SHW Group — Joe Craddock SHW Group — Mike Elmore FUGRO SOUTH, INC. �GRO 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 464 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT Coppell ISD, c/o K A Sparks Report Date September 18, 2000 PROJECT Coppell ISD Administration Building, Coppell, Texas Project NO.: 0700 -2189 SAMPLE DATE: August 17, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. ( °F): CONCRETE TEMP. ( °F) (ASTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: K. A. Sparks 3110567 CONCRETE SUPPLIER: LMC 85 PLANT/TRUCK: 3/964 89 MIX ID NUMBER: 39 6:32 AIR ( %) (ASTM C -231) : 3150 7:15 WATER ADDED (gal): 20 Clear SLUMP (in .) (ASTM C -143) : 5.50 Paving: Parking area, 25 feet south of building, 75 feet west of southeast corner of building 110500 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 28.27 square inches CYLINDER NUMBER AGE (days) DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE STRENGTH (psi) SPECIFIED COMPRESSIVE STRENGTH (psi) CAC 9 5 08/22/00 89000 3150 3500/28 days CAC 10 7 08/24/00 94300 3340 CAC 11 28 09/14/00 110500 3910 CAC 12 28 09/14/00 107200 3790 CAC 13 Hold Specifications: Making & ASTM C -31 Curing: Testing ASTM C -143, Methods: ASTM C-39 Fracture mode is (A) unless otherwise noted Types of Fracture: An B C D REMARKS: Technician: Bob Shea FUGRO SOUTH INC. Reviewed By: SMH /rm Distribution: K A Sparks Contractors Inc. — Jim Schooler City of Coppell — Larry Davis Coppell ISD — Mickey Harper SHW Group — Joe Craddock SHW Group — Mike Elmore