Loading...
ST9302-CS 970729July29, 1997 7 Aft E'~'~i/Je~'I~' Mr. Kenneth M. Griffin, P.E. ~ ~ Assistant City Manager/City Engineer /4fiJ /m~ Mr. Gary L. Sieb, A.I.C.P. Director of Planning and Community Services City of Coppell 255 Parkway Boulevard P.O. Box 478 Coppell, TX 75019-4409 Re: Sandy Lake Road Construction Dear Gary and Ken: I know the City will be glad when the construction of Sandy Lake Road begins (and ends). I wanted to make a request to both of you with respect to the barrier free ramps at each intersection along Sandy Lake Road. The last time I looked at the construction documents for this roadway, the barrier free ramps at each intersection wore to be constructed of concrete with no alternative materials specified. We all know and understand that even with the extensive landscaping proposed for this project, Sandy Lake Road will transform from a two-lane "rural" roadway into a four-lane "URBAN" street. A design feature that would further soften this "urbanization" would be to construct ALL barder free ramps with bdck pavers to match Parkway Boulevard and other areas of the City. I believe it is important to implement these types of project design features to assist the City of Coppell citizens in accepting this project as presented for the 1990 Bond Program vote. If for some reason the roadway budget can not directly absorb these psvers, maybe some of the landscaping features can be minimally reduced to implement this request. We can always plant more trees and shrubs but once the barder free ramps are constructed with concrete wo will never go back and re-construct out of bavers. I think the City Staff has done a good job in dealing with the issues of this project but if you don't mind could you deal with just one more. I personally appreciate it, and in the long run, the citizens of Coppell will appreciate it also. Thanks. not John and Maureen Maggiore {p tllvO/-J~ ~ ~ 5 1 ~ J~ '-..J. i' .'v'~ 5-h/J( '~. 102 Allencrest Lane Coppell, Texas 75019 0'7'~ nr Mayor C