Loading...
SC-Coppell ABA-LR000914FUGRO SOUTH, INC. ..., — pawn 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 4848301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD, c/o K A Sparks Report Date: September 14, 2000 PROJECT: Coppell ISD Administration Building, Coppell, Texas Project No.: 0700 -2189 SA PLE DATE: August 31, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. ( °F): CONCRETE TEMP. ( °F) (ASTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: K. A. Sparks 3111575 CONCRETE SUPPLIER: LMC 94 PLANT/TRUCK: 3/1096 90 MIX ID NUMBER: 110820 9:20 AIR ( %) (ASTM C -231) : LOAD 9:45 WATER ADDED (gal): 0 Clear SLUMP (in.) (ASTM C -143) : 5 Floor slab, 5 feet east, 10 feet south from northwest corner CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CAC 27 7 09/07/00 68700 2430 3000/28 days CAC 28 28 09/28/00 CAC 29 28 09/28/00 CAC 30 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C -31 Testing ASTM C -143, Types of Curing: Methods: ASTM C -39 Fracture: A® BE CZ D REMARKS: Technician: Zia Masumi FUGRO SOUTH INC. Reviewed By: SMH /rm Distribution: K A Sparks Contractors Inc. — Jim Schooler City of Coppell — Larry Davis ✓ Coppell ISD - Mickey Harper SHW Group — Joe Craddock SHW Group — Mike Elmore