SC-Coppell ABA-LR000911I FUGRO SOUTH, INC. Y 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 OBSERVATION OF CONCRETE PLACEMENT CLIENT: Coppell ISD, c/o K A Sparks REPORT DATE: September 11, 2000 PROJECT Coppell ISD Administration Building, Coppell, Texas PROJECT NO: 0700 -2189 DATE PERFORMED: September 5, 2000 General Contractor: K.A. Sparks / The Cortez Group Method of Test Applicable ACI Recommendations and ASTM Standards Results / Remarks: Concrete placement observation was performed at the Slab for administration section of building following location: Time placement began: Time placement ended: Total cubic yards placed: Slump range (inches): Slump required (inches): Concrete supplier and plant: Concrete temperature range ( °F): Strength required (psi /days): Number of cylinders made: Superplasticizer used: Yancey Bivings Fugro South Technician 8:30 a.m. 10:10 a.m. 40 5.0 to 6.0 5.0 LMC -Plant No.: 3 90 - 92 °F 3000/28 4 No FUGRO SOUTH, INC. Reviewed By: ::!:, 7.�-s._ — SMH /bg Distribution: K A Sparks Contractors Inc. — Jim Schooler City of Coppell — Larry Davis Coppell ISD — Mickey Harper SHW Group — Joe Craddock SHW Group — Mike Elmore FUGRO SOUTH, INC. SRO 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301, Fax (972) 620 -7328 OBSERVATION OF CONCRETE PLACEMENT CLIENT: Coppell ISD, c/o K A Sparks REPORT DATE: September 11, 2000 PROJECT: Coppell ISD Administration Building, Coppell, Texas PROJECT NO: 0700 -2189 DATE PERFORMED: August 31, 2000 General Contractor: K.A. Sparks Method of Test: Applicable ACI Recommendations and ASTM Standards Results / Remarks: Concrete placement observation was performed at the Floor Slab - north half of floor following location: Time placement began: Time placement ended: Total cubic yards placed: Slump range (inches): Slump required (inches): Concrete supplier and plant: Concrete temperature range ( °F): Strength required (psi /days): Number of cylinders made: Superplasticizer used: Zia Masumi Fugro South Technician 8:30 a.m. 11:30 a.m. 40 5.0 5.0 TXI -Plant No.: 3 90 °F 3000/28 4 No FUGRO SOUTH, INC. Reviewed By: SMH /bg Distribution: K A Sparks Contractors Inc. — Jim Schooler City of Coppell — Larry Davis Coppell ISD — Mickey Harper SHW Group — Joe Craddock SHW Group — Mike Elmore FUGRO SOUTH, INC. Aawn 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD, c/o K A Sparks Report Date: September 11, 2000 PROJECT: Coppell ISD Administration Building, Coppell, Texas Project No.: 0700 -2189 SAMPLE DATE: August 11, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. ( °F) (ASTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Cortez Group 14138118 CONCRETE SUPPLIER: Lattimore 100 PLANTITRUCK: 14/1119 88 MIX ID NUMBER: 17 1:32 AIR ( %) (ASTM C -231) : DATE 2:40 WATER ADDED (gal): 10 Clear SLUMP (in.) (ASTM C -143) : 6 Piers: S10 -S16, sampled at S12 (psi) CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CAC 5 7 08/18/00 83700 2960 3000/28 days CAC 6 28 09/08/00 120400 4260 CAC 7 28 09/08/00 123000 4350 CAC 8 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C -31 Testing ASTM C -143, Types of Curing: Methods: ASTM C -39 Fracture: A® B® C D REMARKS: Technician: Steven Campbell FUGRO SOUTH INC. Reviewed By: SMH /rm Distribution: K A Sparks Contractors Inc. — Jim Schooler City of Coppell — Larry Davis Coppell ISD — Mickey Harper SHW Group — Joe Craddock SHW Group — Mike Elmore