SC-Coppell ABA-LR000814�6R0
FUGRO SOUTH, INC.
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484 -8301; Fax (972) 620 -7328
DRILLED BELLED PIER OBSERVATION REPORT
CLIENT: Coppell ISD, c/o K A Sparks REPORT DATE August 14, 2000
PROJECT: Coppell ISD Administration Building, Coppell, Texas PROJECT NO: 0700 -2189
DRILLING CONTRACTOR: Wylie Drilling
DATE PERFORMED: August 10, 2000
LOCATION: East of Existing Building
Pier
Number
Required
Shaft
Diameter, in.,.
Required
Bell
{ Diameter, in „
Total Depth,
ft:
Proper
,Alignment
V1Fater
Present
Remarks
N -1
18
36
9.9
Yes
No
N -2
18
36
9.5
Yes
No
N -3
18
36
9.5
Yes
No
E -4
18
36
9.7
Yes
No
E -5
18
36
9.5
Yes
No
E -6
18
36
9.8
Yes
No
E -7
18
36
10.1
Yes
No
E -8
18
36
10.2
Yes
No
E -9
18
36
10.0
Yes
No
S -17
18
36
12.5
1 Yes
No
Reinforcing steel checked in all piers and found to be in accordance with project requirements, unless
otherwise noted.
Bearing Material: Tan and gray clay
Steve Campbell
Fugro South Technician FUGRO SOUTH, INC.
Reviewed By:
SMH /bg
Distribution: K A Sparks Contractors Inc. — im Schooler
City of Coppell — Larry Davis
Coppell ISD — Mickey Harper
SHW Group — Joe Craddock
SHW Group — Mike Elmore