Loading...
SC-Coppell ABA-LR000814�6R0 FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 DRILLED BELLED PIER OBSERVATION REPORT CLIENT: Coppell ISD, c/o K A Sparks REPORT DATE August 14, 2000 PROJECT: Coppell ISD Administration Building, Coppell, Texas PROJECT NO: 0700 -2189 DRILLING CONTRACTOR: Wylie Drilling DATE PERFORMED: August 10, 2000 LOCATION: East of Existing Building Pier Number Required Shaft Diameter, in.,. Required Bell { Diameter, in „ Total Depth, ft: Proper ,Alignment V1Fater Present Remarks N -1 18 36 9.9 Yes No N -2 18 36 9.5 Yes No N -3 18 36 9.5 Yes No E -4 18 36 9.7 Yes No E -5 18 36 9.5 Yes No E -6 18 36 9.8 Yes No E -7 18 36 10.1 Yes No E -8 18 36 10.2 Yes No E -9 18 36 10.0 Yes No S -17 18 36 12.5 1 Yes No Reinforcing steel checked in all piers and found to be in accordance with project requirements, unless otherwise noted. Bearing Material: Tan and gray clay Steve Campbell Fugro South Technician FUGRO SOUTH, INC. Reviewed By: SMH /bg Distribution: K A Sparks Contractors Inc. — im Schooler City of Coppell — Larry Davis Coppell ISD — Mickey Harper SHW Group — Joe Craddock SHW Group — Mike Elmore