Loading...
SC-Coppell ABA-LR000728e^` tiRO FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 4848301; Fax (972) 620 -7328 FIELD DENSITY REPORT CLIENT: Coppell ISD, c/o K A Sparks REPORT DATE: July 28, 2000 PROJECT: Coppell ISD Administration Building, Coppell, Texas PROJECT NO.: 0700 -2189 DATE PERFORMED: July 26, 2000 Density Test Method: ASTM D -2922 & 3017 Method of Compaction: ASTM D-698 MOISTURE/DENSITY RELATIONS Material Proctor Results Number Description Maximum Dry Density (pcf) Optimum Moisture (Ye) 1 Reddish orange clayey sand 115.1 13.0 2 Brown sandy clay 113.5 14.8 TEST RESULTS TEST PROCTOR LOCATION UNIT DRY MOISTURE PERCENT OF NO. NO. WEIGHT CONTENT PERCENT MAXIMUM DENSITY 6 1 Building subgrade at southeast corner, 5 110.7 13.8 96.1 feet west and 7 feet north, 3` lift 7 1 Building subgrade at northwest corner, 20 109.8 14.2 95.4 feet east and 5 feet south, 3r lift 8 2 Fireland, 40 feet east off southwest 109.5 15.5 96.5 corner, 15 feet south, natural 9 2 Firelane, 60 feet east off southwest 107.8 15.0 95.0 corner, 40 feet north, natural Remarks: All densities meet project specifications unless otherwise noted. Thomas Cranford Fugro South Technician FUGRO SOUTH INC. Reviewed By: — i>- SMH /bg Distribution: K A Sparks Contractors Inc. — Ji Schooler City of Coppell — Larry Davi Coppell ISD — Mickey Harper SHW Group — Joe Craddock SHW Group — Mike Elmore