Loading...
SC-Coppell ABA-LR000720ORO FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 4844301; Fax (972) 620 -7328 MOISTUREMENSITY RELATIONSHIP OF SOILS CLIENT: Coppell ISD, c/o K A Sparks REPORT DATE: July 20, 2000 PROJECT: Coppell ISD Administration Building, Coppell, Texas PROJECT NO: 0700 -2189 SAMPLE DATE: July 10, 2000 METHOD OF TEST: SAMPLE IDENTIFICATION: Sample Description: Sample Origin: MOISTURE /DENSITY: Preparation Procedure: Rammer Description: Maximum Dry Density: (lbs /cu ft) Optimum Moisture Content ( %): ATTERBERG LIMITS: Liquid Limit: Plastic Limit: Plasticity Index: GRAIN SIZE: Percent Passing ( -200) Sieve: Sammy Roberts Fugro South Technician ASTM D- 698(A) Reddish orange silty sand, Select Hauled in by truck Moist Mechanical 115.1 13.0 Non - Plastic 22 FUGRO SOUTH INC. Reviewed By: SMH /bg Distribution: K A Sparks Contractors Inc. —rfi Schooler City of Coppell — Larry Davis/ Coppell ISD — Mickey Harper SHW Group — Joe Craddock SHW Group — Mike Elmore • 5 man FUGRO SOUTH, INC. 211W Virgo Lane; Dallas, Te m 75229 Ph (972) 484 -8301; Fax (972) 020 -7328 FIELD DENSITY REPORT CLIENT: Coppell ISD, c/o K A Sparks REPORT DATE: July 20, 2000 PROJECT: Coppell ISD Administration Building, Coppell, Texas PROJECT NO.: 0700 -2189 DATE PERFORMED: July 13, 2000 Density Test Method: ASTM D -2922 & 3017 Method of Compaction: ASTM D-698 MOISTURE/DENSITY RELATIONS Material Proctor Results Number Description Maximum Dry Density (pcf) Optimum Moisture ( %) 1 Brown sandy clay 113.5 14.8 TEST RESULTS TEST PROCTOR LOCATION UNIT DRY MOISTURE PERCENT OF NO. NO. WEIGHT CONTENT PERCENT MAXIMUM DENSITY 1 1 Building Pad, 30 feet east, 30 feet south 113.0 15.0 99.6 from northwest comer, natural Remarks: All densities meet project specifications unless otherwise noted. Zia Masumi Fugro South Technician SMH /bg Distribution: K A Sparks Contractors Inc. — Jim Sehooler City of Coppell — Lary Davis Coppell ISD — Mickey Harper SHW Group — Joe Craddock SHW Group — Mike Elmore FUGRO SOUTH INC. Reviewed By: JtiiRO FUGRO SOUTH, INC. 2880 ViW Lane; Dallas, Texas 75229 Ph (972) 484 -8301: Fax (972) 820 -7328 MOISTURE /DENSITY RELATIONSHIP OF SOILS CLIENT: Coppell ISD, c/o K A Sparks REPORT DATE: July 20, 2000 PROJECT: Coppell ISD Administration Building, Coppell, Texas PROJECT NO: 0700 -2189 SAMPLE DATE: July 13, 2000 METHOD OF TEST: SAMPLE IDENTIFICATION: Sample Description: Sample Origin: MOISTURE/DENSITY: Preparation Procedure: Rammer Description: Maximum Dry Density: (lbs/cu ft) Optimum Moisture Content (%): ATTERBERG LIMITS: Liquid Limit: Plastic Limit: Plasticity Index: Zia Masumi Fugro South Technician SMH /bg Distribution: ASTM D- 698(A) Brown sandy clay On -Site Moist Manual 113.5 14.8 26 15 11 FUGRO SOUTH INC. Reviewed By:__ _ K A Sparks Contractors Inc. — Jim Schooler City of Coppell — Larry Davis Coppell ISD — Mickey Harper SHW Group — Joe Craddock SHW Group — Mike Elmore FUGRO SOUTH, INC. ®Ra 2880 VIW Lon, Dallas, To= 75229 Ph (972) 484 -8301; Fax (972) 820.7328 GENERAL REPORT CLIENT: Coppell ISD, c/o K A Sparks PROJECT: Coppell ISD Administration Building, Coppell, Texas ` 40 1 REPORT DATE: July 20, 2000 PROJECT NO: 0700 -2189 DAILY ACTIVITY REPORT: July 19, 2000 Services Performed: visual Inspection Weather Conditions: Fair Contractors on Site: K.A. Sparks Remarks: On this date, a representative of Fugro South, Inc. was present on the above mentioned project to perform the following tests and observations as requested: Building subgrade select fill testing was scheduled, however upon arrival at the job site the material, a reddish orange silty sand, which had been placed and compacted appeared to be non - plastic. After obtaining the Atterberg Limits test results from our lab it was confirmed that the material being placed did have a zero plastic limit and a -200 sieve result of twenty-two, neither of which fit the project specification criteria for select fill. The K.A. Sparks Superintendent Jerry Jones was advised of the test results and density testing was cancelled. Mr. Jones indicated that he would not place any more of the non- compliant material unless approved by the architect. Skip Martin Fugro South Technician FUGRO SOUTH, INC. P.E. David A. Belcher, Sr. Project Manager SMH /bg Distribution: K A Sparks Contractors Inc. — Jim Schooler City of Coppell — Larry Davis Coppell ISD — Mickey Harper SHW Group — Joe Craddock SHW Group — Mike Elmore