Loading...
SC-Coppell HS-LR000623FUGRO SOUTH, INC. 2880 Vtrgo Lane; Dallas, Texas ?~?.29 Ph (972)484-8301; Fax (972) 620-7328 CLIENT: PROJECT: COMPRESSIVE STRENGTH OF GROUT REPORT Coppell lSD, c/o Dal - Mac Construction Co. Coppell High School, Multi Purpose Building Coppell, Texas Report Date: June 23, 2000 Project No.: 0791-2208 SAMPLE DATE: April 27, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): GROUT TEMP. (°F): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: C&D Overcast Course 30, R-11 GROUT SUPPLIER: PLANT/TRUCK: MIX ID NUMBER: AIR (%) (ASTM C-231) WATER ADDED: SLUMP (inches) (ASTM C.143) GROUT cYLINDER COMPRESSIVE STRENGTH TESTS Standard 3" x 6", 7.07 square inches CYUNDER AGE DATE TOTAL LOAD COMPRESSIVE REQUIRED COMPRESSIVE NUMBER (days) TESTED (pounds) STRENGTH STRENGTH (psi) (psi) CHC 21 12 05/09/00 3260 460* 2400/28 days · CHC 22 28 05/25/00 4870 690* CHC 23 28 06/25/00 4600 650* CHC 24 56 06/22/00 6660 940* Specifications: Making & ASTM C-31 Testing Methods: ASTM C-143. ASTM C-39 Curing: REMARKS; * Possible Iow 28 day test results based on 12 day results. · Does not meet required compressive strength at 28 or 56 days. Technician: Mark Strittmatter FUGRO SOUTH, INC. Reviewed By: ~ SMH/rm Distribution: DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone / City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford