Loading...
SC-Coppell HS-LR000608FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 CLIENT: PROJECT: COMPRESSIVE STRENGTH OF GROUT REPORT Coppell lSD, cio Dal - Mac Construction Co. Coppell High School, Multi Purpose Building Coppell, Texas Report Date: June 8, 2000 Project No.: 0791-2208 SAMPLE DATE: May 8, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): GROUT TEMP. (°F): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: C & D Masonry 89 9:15 9:35 Sunny GROUT SUPPLIER: PLANT/TRUCK: MIX ID NUMBER: AIR (%) (ASTM C-231) WATER ADDED: SLUMP (inches) (ASTM C-143) J Line between 1 & 15 top course, Area C GROUT CYLINDER COMPRESSIVE STRENGTH TESTS Standard 3" x 6", 7.07 square inches CYLINDER AGE DATE TOTAL LOAD COMPRESSIVE REQUIRED COMPRESSIVE NUMBER (days) TESTED (pounds) STRENGTH STRENGTH (psi) (psi) CHC 25 7 05/15/00 6740 960 2400/28 days CHC 26 28 06/05100 10750 1520' CHC 27 28 06/05/00 10570 1500' CHC 28 56 07/03/00 Specifications: Making & ASTM C-31 Testing Methods: ASTM C-143, ASTM C-39 Curing: REMARKS: * Does not meet required compressive strength at 28 days. Technician: Mike Flute FUGRO SOUTH, INC. SMH/rm Distribution: DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis ,~/ Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford Reviewed By: ~