SC-Coppell HS-LR000531FUGRO SOUTH, INC.
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
COMPRESSIVE STRENGTH OF GROUT
CLIENT:
PROJECT:
Coppell lSD, c/o Dal - Mac Construction Co.
Coppell High School, Multi Purpose Building
Coppell, Texas
Report Date: May 31,2000
Project No.: 0791-2208
SAMPLE DATE: May 26, 2000
General Contractor:
Method of Test:
Sample Location:
Results I Remarks:
Dal Mac
ASTM C-109
R-13, Course 11
SAMPLE AGE DATE AREA APPLIED COMPRESSIVE REQUIRED
NUMBER TESTED LOAD STRENGTH STRENGTH
(days) (sq. in.) (lbs.) (psi) (psi/da)s),,'
CHC 17 8 05/03/00 3000 420* 2400/28
CHC 18 28 05/24/00 5900 840*
CHC 19 28 05/24/00 6130 870*
CHC 20 56 06/21/00
· Remarks: *Does not meet required compressive strength at 8 or 28 days.
Mike Flute
Fugro South Technician
FUGRO SOUTH INC.
Reviewed By:
SMH/rm
Distribution:
DaI-Mac Construction - Damon Norman
City Of Coppell - Lee Stone
City of Coppell - Larry Davis
Coppell lSD - Mickey Harper
SHW Group - Joe Craddock
SHW Group - Mike Elmore
JRJ Paving - Jeff Williford
FUGRO SOUTH, INC.
2880 VIrgo Lane; Dallas, Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
CLIENT:
PROJECT:
COMPRESSIVE STRENGTH OF GROUT REPORT
Coppell lSD, c/o Dal - Mac Construction Co.
Coppell High School, Multi Purpose Building
Coppell, Texas
Report Date: May 31,2000
Project No.: 0791-2208
SAMPLE DATE: April 27, 2000
CONTRACTOR:
TICKET NO.:
AMBIENT TEMP. (°F):
GROUT TEMP. (°F):
TIME BATCHED:
TIME SAMPLED:
WEATHER CONDITION:
LOCATION OF PLACEMENT:
C&D
Overcast
Course 30, R-11
GROUT SUPPLIER:
PLANT/TRUCK:
MIX ID NUMBER:
AIR (%) (ASTM C-231)
WATER ADDED:
SLUMP (inches) (ASTM C-143)
GROUT CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 3" x 6", 7.07 square inches
CYUNDER AGE DATE 'TOTAL LOAD COMPRESSIVE REQUIRED COMPREsSIvE
NUMBER (days) TESTED (pounds) STRENGTH STRENGTH
(psi) (psi)
C H C 21 12 05/09/00 3260 460* 2400/28 days
CHC 22 28 05/25/00 4870 690*
CHC 23 28 06/25/00 4600 650*
CHC 24 56 06/22/00
Specifications: Making & ASTM C-31 Testing Methods: ASTM C-143, ASTM C-39
Cudng:
REMARKS: * Possible Iow 28 day test results based on 12 day results.
· Does not meet required compressive strength at 28 days.
Technician: Mark Strittmatter
FUGRO SOUTH, INC.
Reviewed By:~
SMH/rm
Distribution:
DaI-Mac Construction - Damon Norman
City of Coppell - Lee Stone
City of Coppell - Larry Davis
Coppell lSD - Mickey Harper
SHW Group - Joe Craddock
SHW Group - Mike Elmore
JRJ Paving - Jeff Williford