Loading...
SC-Coppell HS-LR000531FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF GROUT CLIENT: PROJECT: Coppell lSD, c/o Dal - Mac Construction Co. Coppell High School, Multi Purpose Building Coppell, Texas Report Date: May 31,2000 Project No.: 0791-2208 SAMPLE DATE: May 26, 2000 General Contractor: Method of Test: Sample Location: Results I Remarks: Dal Mac ASTM C-109 R-13, Course 11 SAMPLE AGE DATE AREA APPLIED COMPRESSIVE REQUIRED NUMBER TESTED LOAD STRENGTH STRENGTH (days) (sq. in.) (lbs.) (psi) (psi/da)s),,' CHC 17 8 05/03/00 3000 420* 2400/28 CHC 18 28 05/24/00 5900 840* CHC 19 28 05/24/00 6130 870* CHC 20 56 06/21/00 · Remarks: *Does not meet required compressive strength at 8 or 28 days. Mike Flute Fugro South Technician FUGRO SOUTH INC. Reviewed By: SMH/rm Distribution: DaI-Mac Construction - Damon Norman City Of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 VIrgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 CLIENT: PROJECT: COMPRESSIVE STRENGTH OF GROUT REPORT Coppell lSD, c/o Dal - Mac Construction Co. Coppell High School, Multi Purpose Building Coppell, Texas Report Date: May 31,2000 Project No.: 0791-2208 SAMPLE DATE: April 27, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): GROUT TEMP. (°F): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: C&D Overcast Course 30, R-11 GROUT SUPPLIER: PLANT/TRUCK: MIX ID NUMBER: AIR (%) (ASTM C-231) WATER ADDED: SLUMP (inches) (ASTM C-143) GROUT CYLINDER COMPRESSIVE STRENGTH TESTS Standard 3" x 6", 7.07 square inches CYUNDER AGE DATE 'TOTAL LOAD COMPRESSIVE REQUIRED COMPREsSIvE NUMBER (days) TESTED (pounds) STRENGTH STRENGTH (psi) (psi) C H C 21 12 05/09/00 3260 460* 2400/28 days CHC 22 28 05/25/00 4870 690* CHC 23 28 06/25/00 4600 650* CHC 24 56 06/22/00 Specifications: Making & ASTM C-31 Testing Methods: ASTM C-143, ASTM C-39 Cudng: REMARKS: * Possible Iow 28 day test results based on 12 day results. · Does not meet required compressive strength at 28 days. Technician: Mark Strittmatter FUGRO SOUTH, INC. Reviewed By:~ SMH/rm Distribution: DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford