Loading...
SC-Coppell HS-LR000508FUGRO SOUTH, INC. CLIENT: PROJECT: 2880 Virgo Lane; Dal;as, Texas 75229 Ph (972) 4848301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF GROUT REPORT Coppell lSD, c/o Dal- Mac Construction Co. Coppell High School, Multi Purpose Building Coppell, Texas Report Date: May 8, 2000 Project No.: 0791-2208 SAMPLE DATE: April 26, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): GROUT TEMP. (°F): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: DaI-Mac R-13 - Course 11 GROUT SUPPLIER: PLANT/TRUCK: MIX ID NUMBER: AIR (%) (ASTM C-23t) WATER ADDED: SLUMP (inches) (ASTM C-143) GROUT CYLINDER COMPRESSIVE STRENGTH TESTS Standard 3" x 6", 7.07 square inches CYLINDER AGE DATE TOTAL LOAD COMPRESSIVE REQUIRED COMPRESSIVE NUMBER (days) TESTED (pounds) STRENGTH STRENGTH (psi) (psi) CHC 17 7 05-03-00 3000 420' 2400/28 days CHC 18 28 05-24-00 CHC 19 28 05-24-00 CHC 20 Hold Specifications: Making & ASTM C-31 Testing Methods: ASTM C-143, ASTM C-39 Cudn~l: REMARKS: *Possible Iow 28 day compressive concrete strength results based on 7 day test result. Technician: Mike Flute FUGRO SOUTH, INC. SMH/bg Distribution: DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford Reviewed By: ~ FUGRO SOUTH, INC. 2880 Virgo L~-~; ~,_-~, T~×~ 75'~'~ Ph (9T2) 484-8301; Fax (072} 620-7328 COMPRESSIVE STRENGTH OF GROUT CLIENT: PROJECT: Coppell lSD, cio Dal- Mac Construction Co. Coppell High School, Multi Purpose Building Coppell, Texas Report Date: May 8, 2000 Project No.: 0791-2208 SAMPLE DATE: April 21, 2000 "1 General Contractor: Method of Test: Sample Location: Results I Remarks: C&D ASTM C-109 Course 22 at Grid Line A-1 SAMPLE AGE DATE AREA APPLIED COMPRESSIVE REQUIRED NUMBER TESTED LOAD STRENGTH STRENGTH (days) (sq. in.) (lbs.) (psi) (psi/days) CHC 13 7 04-28-00 9130 1300 2400(2,8 CHC 14 28 05-19-00 ,,, CHC 15 28 05-19-00 CHC 16 Hold Remarks: Mike Flute Fugro South Technician SMH/bg Distribution: DaI-Mac Construction - Damon Norman City Of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH INC. Reviewed By: ~