Loading...
SC-Coppell HS-LR000428FUGRO SOUTH, INC. i CLIENT: PROJECT: 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF GROUT REPORT Coppell lSD, cio Dal - Mac Construction Co. Coppell High School, Multi Purpose Building Coppell, Texas Report Date: April 28, 2000 Project No.: 0791-2208 SAMPLE DATE: April 19, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): 82 GROUT TEMP. (°F): 78 TIME BATCHED: 11:05 TIME SAMPLED: 12:00 WEATHER CONDITION: Sunny LOCATION OF PLACEMENT: C & D Masonary GROUT SUPPLIER: PLANT/TRUCK: MIX ID NUMBER: AIR (%) (ASTM C-23'1) WATER ADDED: SLUMP (inches) (ASTM C-143) 12 inch Block Wall, J1-J10 at Course 30 GROUT CYLINDER COMPRESSIVE STRENGTH TESTS Standard 3" x 6', 7.07 square inches CYLINDER AGE DATE TOTAL LOAD COMPRESSIVE REQUIRED COMPRESSIVE NUMBER (days) TESTED (pounds) STRENGTH STRENGTH (psi) (psi) CHC 9 7 4-26-00 17320 2460 2400/28 days CHC 10 28 5-17-00 CHC 11 28 5-17-00 CHC 12 Hold Specifications: Making & ASTM C-31 Testing Methods: ASTM C-143, ASTM C-39 Cudn~: REMARKS: Technician: Mike Flute FUGRO SOUTH, INC. SMH/bg Distribution: DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis j Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike EImore JRJ Paving - Jeff Williford Reviewed By: ~ FUGRO SOUTH, INC. 2880 Vi~go Lane; Da!I=_-_. Texas Ph (972) 484-8301; Fax (972) 820-7328 CLIENT: PROJECT: COMPRESSIVE STRENGTH OF MORTAR CUBES Coppell lSD, c/o Dal - Mac Construction Co. Report Date: April 28, 2000 Coppell High School, Multi Purpose Building Project NO.: 0791-2208 Coppell, Texas SAMPLE DATE: March 29, 2000 Contractor: Method of Test: Sample Location: Time Batched: Results I Remarks: Skinner ASTM C-109 16 Course, 2 ft. south on east wall Multi Purpose Building Time Sampled: Type S SAMPLE AGE DATE AREA APPLIED coMPRESSIVE REQUIRED NUMBER TESTED LOAD STRENGTH STRENGTH (days) (sq. in.) (lbs.) (psi) (psi/days) CHC 37 7 04/05/00 4.0 4500 1130 1800/28 CHC 38 7 04/05/00 4.0 4610 1150 CHC 39 7 04/05/00 4.0 4360 1090 CHC 40 28 04126/00 4.0 5210 1300* CHC 41 28 04/26/00 4.0 5330 1330' CHC 42 28 04/26/00 4.0 5500 1380' Remarks: *Does not meet required compressive strength at 28 days. Thomas Cranford Technician FUGRO SOUTH INC. Reviewed By: ~ SMH/bg Distribution: DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford