Loading...
SC-Coppell HS-LR000331FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Coppell lSD, c/o Dal - Mac Construction Co. Coppell High School, Multi Purpose Building Coppell, Texas Report Date: March 31,2000 Project No.: 0791-2208 SAMPLE DATE: March 1, 2000 CONTRACTOR: Cortez Group TICKET NO.: 7084052 AMBIENT TEMP. (°F): 57 CONCRETE TEMP. (°F) (ASTM C-t064): 81 TIME BATCHED: 9:20 TIME SAMPLED: 10:15 WEATHER CONDITION: Clear LOCATION OF PLACEMENT: CONCRETE SUPPLIER: Lattimom PLANT/TRUCK: 7-757 MIX ID NUMBER: 16 AIR (%) (ASTM C-231): 4.7 WATER ADDED (gal): SLUMP (in.) (ASTM C.143): 4 Slab 5 feet East - 4 feet South Area B - 3 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYUNDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 668 7 3-8-00 81000 2870 3000/28 days CHC 669 28 3-29-00 111000 3930 CHC 670 28 3-29-00 109000 3860 CHC 671 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof ~] ~ ~ ~ Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: SMH/rm Distribution: Thomas Cranford FUGRO SOUTH INC. Reviewed By:~ DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Coppell lSD, c/o Dal - Mac Construction Co. Coppell High School, Multi Purpose Building Coppell, Texas Report Date: March 31, 2000 Project No.: 0791-2208 SAMPLE DATE: March 1, 2000 CONTRACTOR: Cortez Group TICKET NO.: 7084058 AMBIENT TEMP. (°F): 60 CONCRETE TEMP. (°F) (ASTM C.1064): 80 TIME BATCHED: 9:40 TIME SAMPLED: 10:25 WEATHER CON DITION: Warm LOCATION OF PLACEMENT: CONCRETE SUPPLIER: Lattimore PLANT/TRUCK: 7-706 MIX ID NUMBER: 16 AIR (%) (ASTM C-23t): 4.6 WATER ADDED (gal): 10 SLUMP (in.) (ASTM C.143): 5 Slab - Area B3 10 feet South 15 feet East CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYUNDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 672 7 3-8-00 83000 2940 3000/28 days CHC 673 28 3-29-00 107000 3790 CHC 674 28 3-29-00 110000 3860 CHC 675 Hold Fracture mode is (A) unless othem~ise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof ~;;~ r'~ r-~ [-"] Curing: Methods: ASTM C-39 Fracture: Av~J V%i VI I lB C D REMARKS: Technician: SMH/mm Distribution: Thomas Cranford FUGRO SOUTH INC. Reviewed By: ~ Dai-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Coppell lSD, c/o Dal - Mac Construction Co. Coppell High School, Multi Purpose Building Coppell, Texas Report Date: March 31, 2000 Project No.: 0791-2208 SAMPLE DATE: March 1, 2000 CONTRACTOR: Cortez Group TICKET NO.: 7084063 AMBIENT TEMP. (°F): 60 CONCRETE TEMP. (°F) (ASWa C.10S4): 80 TIME BATCHED: 10:08 TIME SAMPLED: 10:35 WEATHER CONDITION: Warm LOCATION OF PLACEMENT: CONCRETE SUPPLIER: Lattimore PLANTrrRUCK: 7-958 MIX ID NUMBER: 16 AIR (%) (ASWa C-231): 4.7 WATER ADDED (gal): 10 SLUMP (in.) (ASTM C-143): 4 -3/4 Slab Area B-2 15 feet South 25 feet East CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYUNDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 676 7 3-8-00 84000 2970 3000/28 days , , CHC 677 28 3-29-00 109000 3860 CHC 678 28 3-29-00 106000 3750 CHC 679 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM 0-143. Typesof ~] [~] ~ ~ Cudng: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: Thomas Cranford FUGRO SOUTH INC. SMH/rm Distribution: Reviewed By: ~ DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. i 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Coppell lSD, c/o Dal - Mac Construction Co. Coppell High School, Multi Purpose Building Coppell, Texas Report Date: March 31, 2000 Project No.: 0791-2208 SAMPLE DATE: March 1, 2000 CONTRACTOR: Cortez Group TICKET NO.: 7084067 AMBIENT TEMP. (°F): 61 CONCRETE TEMP. (°F) (ASWa C.t064): 80 TIME BATCHED: 10:41 TIME SAMPLED: 11:15 WEATHER CONDITION: Clear LOCATION OF PLACEMENT: CONCRETE SUPPLIER: Lattimore PLANT/TRUCK: 7-757 MIX ID NUMBER: 16 AIR (%) (ASTM C-23t): 4.7 WATER ADDED (gal): 10 SLUMP (in.) (ASTM C-t43): 4 -1/2 Slab Area B-2 5 feet South 30 feet East CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYMNDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 680 7 3-8-00 88000 3110 3000/28 days CHC 681 28 3-29-00 117000 4140 CHC 682 28 3-29-00 115000 4070 CHC 683 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typasof B [~ ~~ Curing: Me.ods: ASTM C-39 Fracture: A B C D REMARKS: Technician: Thomas Cranford FUGRO SOUTH INC. SMH/rm Distribution: Reviewed By: .c,"'"'T~'~'~...~ DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 820-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Coppell lSD, c/o Dal - Mac Construction Co. Coppell High School, Multi Purpose Building Coppell, Texas Report Date: March 31, 2000 Project No.: 0791-2208 SAMPLE DATE: March 1, 2000 CONTRACTOR: Cortez Group TICKET NO.: 708470 AMBIENT TEMP. (°F): 63 CONCRETE TEMP. (°F) (ASTM C-10S4): 81 TIME BATCHED: 11:07 TIME SAMPLED: 11:45 WEATHER CONDITION: Warm LOCATION OF PLACEMENT: CONCRETE SUPPLIER: Lattimore PLANT/TRUCK: 7-959 MIX ID NUMBER: 16 AIR (%) (ASTM C-231): 4.5 WATER ADDED (gal): 10 SLUMP (in.) (ASTM C.143): 5 Slab Area B-2 3 feet South 40 feet East CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) ,(psi) CHC 684 7 3-8-00 101000 3570 3000/28 da~/s .i CHC 685 28 3-29-00 131000 4630 CHC 686 28 3-29-00 133000 4710 CHC 687 Hold Fracture mode is (A) unless otherwise noted ' Specifications: Making & ASTM 0-31 Testing ASTM C-143, Typesof [~ ~] ~ ~ Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: Thomas Cranford FUGRO SOUTH INC. SMH/mm Distribution: Reviewed By: ~ DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972)484-8301: F~x (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Coppell lSD, c/o Dal - Mac Construction Co. Coppell High School, Multi Purpose Building Coppell, Texas Report Date: March 31, 2000 Project No.: 0791-2208 SAMPLE DATE: March 1, 2000 CONTRACTOR: TICKET NO.: 3100257 AMBIENT TEMP. (°F): 67 CONCRETE TEMP. (°F) (ASTM C-1064): 82 TIME BATCHED: 1:20 TIME SAMPLED: 1:50 WEATHER CONDITION: Warm LOCATION OF PLACEMENT: Slab Area B-1 CONCRETE SUPPLIER: Lattimore PLANT/TRUCK: 3-1064 MIX ID NUMBER: 16 AIR (%) (ASTM C-23t): 4.6 WATER ADDED (gal): 10 SLUMP (in.) (AS?M C.~43): 5 6 feet South - 15 feet East CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square Inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYUNDER AGE DATE LOAD STRENGTH STRENGTH NUMBER, (da~) TES,TED (pounds) (ps!) (psi) CHC 696 7 3-8-00 84000 2970 3000/28 da~,s CHC 697 28 3-29-00 109000 3860 CHC 698 28 3-29-00 107000 3790 CHC 699 Hold Fracture mode is (A) unless othepwise noted SpeciflcaU°ns: Making & ASTM C~31 Testing ASTM C'143, Types°f ~] [~] [~1 [~] Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: Thomas Cranford FUGRO SOUTH INC. SMH/rm Distribution: Reviewed By: ~ DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Wiiliford FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Coppell lSD, c/o Dal - Mac Construction Co. Coppell High School, Multi Purpose Building Coppell, Texas Report Date: March 31, 2000 Project No.: 0791-2208 SAMPLE DATE: March 1, 2000 CONTRACTOR: Cortez Group TICKET NO.: 3100253 AMBIENT TEMP. (°F): 66 CONCRETE TEMP. (°F) (ASTM C.10S4): 82 TIME BATCHED: 1:07 TIME SAMPLED: 2:00 WEATHER CONDITION: Warm LOCATION OF PLACEMENT: CONCRETE SUPPLIER: Lattimore PLANT/TRUCK: 3-1059 MIX ID NUMBER: 16 AIR (%) (ASTM C-231): 4.6 WATER ADDED (gal): 10 SLUMP (in.) (ASTM C-143): 5 Slab Area B-1 9 feet East 10 feet South CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYUNDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (da~/s) TESTED (pounds) (psi) (poi) CHC 692 7 3-8-00 82000 2900 3000/28 days CHC 693 28 3-29-00 103000 3640 CHC 694 28 3-29-00 101000 3570 CHC 695 Hold Fracture mode is (A) unless otherwise noted Speciflcaflons: Making & ASTM C-31 Testing ASTM C-143, Typesof ~] ~ [~1 r-] curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: Thomas Cranford FUGRO SOUTH INC. SMH/rm Distribution: Reviewed By: ~,/ ~ ~ DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301: Fax (g72) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: March 31, 2000 PROJECT: Coppell High School, Multi Purpose Building Project No.: 0791-2208 Coppell, Texas SAMPLE DATE: March 1, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) {ASTM C.lOS4): TIME BATCHED: TIME SAMPLED: WEATHER CONDmON: LOCATION OF PLACEMENT: Cortez Group 31 O0244 65 87 12:20 12:55 Warm Slab Area B 1 CONCRETE SUPPLIER: Lattimore PLANT/TRUCK: 3-956 MIX ID NUMBER: 16 AIR (%) (ASTM C-231): 4.8 WATER ADDED (gal): 10 SLUMP (in.) (ASWa C-143): 4 1/2 6 feet East 7 feet South CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square Inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYUNDER AGE DATE LOAD STRENGTH 81'RENGTH , NUMBER {days) TESTED (pounds) (psi) , (psi) CHC 688 7 3-8-O0 98000 3470 3000/28 days CHC 689 28 3-29-00 135000 4780 CHC 690 28 3-29-00 132000 4670 CHC 691 Hold Fracture mode is (A) unless ~ noted Curing: Methocls: ASTM C-39 Fracture: A[AJ [/~J ~JuB c D REMARKS: Technician: Thomas Cranford FUGRO SOUTH INC. SMH/rm Distribution: Reviewed By: ~. DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford