Loading...
SC-Coppell HS-LR000317FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, cio Dal - Mac Construction Co. Report Date: March 17, 2000 PROJECT: Coppell High School, Multi Purpose Building Project No.: 0791-2208 Coppell, Texas SAMPLE February 17, 2000 CONTRACTOR: Dal Mac TICKET NO.: 83559 AMBIENT TEMP. (°F): 62 CONCRETE TEMP. (°F) (ASTM C-'1064): 69 TIME BATCHED: 6:15 TIME SAMPLED: 7:00 WEATHER CONDITION: LOCATION OF PLACEMENT: CONCRETE SUPPLIER: Lattimore PLANT/TRUCK: 71956 MIX ID NUMBER: 16 AIR (%) (ASTM C-23t): WATER ADDED (gal): 0 Partly cloudy SLUMP (in.) (ASTM C-143): 4.5 SLab, upper area of Area C of Multi purpose Building at southwest corner - CONCRETE CYLINDER COMPRESSIVE STRENGTH li::STS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 648 7 02/24/00 87000 3080 3000/28 days ~ CHC 649 28 03/16/00 118000 4170 CHC 650 28 03/16/00 120000 4250 CHC 651 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof ~] ~ ~ Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: David Putman FUGRO SOUTH INC. Reviewed B~~"'"~'~~ SMH/rm Distribution: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford IGiiO FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, cio Dal - Mac Construction Co. Report Date: March 17, 2000 PROJECT: Coppell High School, Multi Purpose Building Project No.: 0791-2208 Coppell, Texas SAMPLE DATE: February 17, 2000 CONTRACTOR: Dal Mac TICKET NO.: 83543 AMBIENT TEMP. (°F): 65 CONCRETE TEMP. (°F) (ASTM C.1064): 73 TIME BATCHED: 3:25 TIME SAMPLED: 4:10 WEATHER CONDITION: LOCATION OF PLACEMENT: CONCRETE SUPPLIER: Lattimore PLANT/TRUCK: 7/1040 MIX ID NUMBER: 16 AIR (%) (ASTM C-231): WATER ADDED (gal): 5 Partly cloudy SLUMP (in.) (ASTM C.143): 4 Slab, upper area of Area C of the Multi Purpose Building, 40 feet west, 75 feet south from northeast comer ' CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 640 7 02/24/00 107000 3790 3000/28 days CHC 641 28 03/16/00 142000 5020 CHC 642 28 03/16/00 144000 5090 CHC 643 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof ~] ~ ~ ~ Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: David Putman FUGRO SOUTH INC. Reviewed By: ~ SMH/rm Distribution: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Coppell lSD, c/o Dal - Mac Construction Co. Coppell High School, Multi Purpose Building Coppell, Texas Report Date: March 17, 2000 Project No.: 0791-2208 SAMPLE DATE: February 17, 2000 CONTRACTOR: Dal Mac TICKET NO.: 83538 AMBIENT TEMP. (°F): 67 CONCRETE TEMP. (°F) (ASTM C-'1064): 73 TIME BATCHED: 2:49 TIME SAMPLED: 3:20 WEATHER CONDITION: Partly cloudy LOCATION OF PLACEMENT: CONCRETE SUPPLIER: Lattimore PLANT/TRUCK: 7/1045 MIX ID NUMBER: 16 AIR (%) (ASTM C.231): WATER ADDED (gal): 5 SLUMP (in.) (ASTM C-'143) .' 4.5 Slab, upper area of Area C of Multi Purpose Building, 20 feet south, 5 feet west from northeast corner CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square Inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 636 7 02/24/00 98000 3470 3000/28 days CHC 637 28 03/16/00 132000 4670 CHC 638 28 03/16/00 135000 4780 CHC 639 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C.31 Testing ASTM C-143, Typesof [~] [~ [~ ["'] Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: David Putman SMH/rm Distribution: FUGRO SOUTH INC. Reviewed By: ~ DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, cio Dal- Mac Construction Co. Report Date: March 17, 2000 PROJECT: Coppell High School, Multi Purpose Building Project NO.: 0791-2208 Coppell, Texas SAMPLE DATE: February 17, 2000 CONTRACTOR: Dal Mac TICKET NO.: 83548 AMBIENT TEMP. (°F): 66 CONCRETE TEMP. (°F) (ASTM C.1064): 72 TIME BATCHED: 4:23 TIME SAMPLED: 5:05 WEATHER CONDITION: LOCATION OF PLACEMENT: CONCRETE SUPPLIER: Lattermore PLANT/TRUCK: 7/938 MIX ID NUMBER: 16 AIR (%) (ASTM C-231): WATER ADDED (gal): 0 Partly cloudy SLUMP (in.) (ASTM C-143): 4 Slab, upper area of Area C of Multi Purpdse Building 45 feet east, 100 feet south from northwest corner CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 644 7 02/24/00 88000 3110 3000/28 days CHC 645 28 03/16/00 127000 4490 CHC 646 28 03/16/00 125000 4420 CHC 647 Hold Fracture mode is (A) unless othem/ise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof [~] [~ [~1 ['"] Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: David Putman FUGRO SOUTH INC. Reviewed By: ~ SMH/rm Distribution: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford