Loading...
SC-Coppell HS-LR000303FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 CLIENT: PROJECT: Ph (972) 484-8301; Fax (972) 620-7328 OBSERVATION OF CONCRETE PLACEMENT Coppell lSD, c/o Dal - Mac Construction Co. Coppell High School, Multi Purpose Building Coppell, Texas DATE PERFORMED: March 1, 2000 Report Date: March 3, 2000 Project No.: 0791-2208 General Contractor: Method of Test: Cortez Group Applicable ACI Recommendations and ASTM Standards Results I Remarks: Concrete placement observation was performed at the following location: Time placement began: Time placement ended: Total cubic yards placed: Slump range (inches): Slump required (inches): Concrete supplier and plant: Concrete temperature range (°F): Strength required (psi/days): Number of cylinders made: Superplasticizer used: Slab for Multi-Purpose Building from Area "B-l" to Area "B-3" 9:30 a.m. 6:00 p.m. 4.0 to 5.0 5.0 Lattimore - Plant Nos: 7 & 3 80 - 82°F 3000/28 32 No Thomas Cranford Fugro South Technician FUGRO SOUTH, INC. SMH/bg Distribution: Reviewed By: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford