OBSERVATION OF CONCRETE PLACEMENT
Coppell lSD, c/o Dal - Mac Construction Co.
Coppell High School, Multi Purpose Building
Coppell, Texas
DATE PERFORMED: March 1, 2000
Report Date: March 3, 2000
Project No.: 0791-2208
General Contractor:
Method of Test:
Cortez Group
Applicable ACI Recommendations and ASTM Standards
Results I Remarks:
Concrete placement observation was performed at the
following location:
Time placement began:
Time placement ended:
Total cubic yards placed:
Slump range (inches):
Slump required (inches):
Concrete supplier and plant:
Concrete temperature range (°F):
Strength required (psi/days):
Number of cylinders made:
Superplasticizer used:
Slab for Multi-Purpose Building from Area "B-l" to Area
"B-3"
9:30 a.m.
6:00 p.m.
4.0 to 5.0
5.0
Lattimore - Plant Nos: 7 & 3
80 - 82°F
3000/28
32
No
Thomas Cranford
Fugro South Technician
FUGRO SOUTH, INC.
SMH/bg
Distribution:
Reviewed By:
DaI-Mac Construction - Damon Norman
City of Coppell - Larry Davis
Coppell lSD - Mickey Harper
SHW Group - Joe Craddock
SHW Group - Mike Elmore
JRJ Paving - Jeff Williford