Loading...
SC-Coppell HS-LR000229FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972)484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Coppell lSD, c/o Dal- Mac Construction Co. Coppell High School, Multi Purpose Building Coppell, Texas Report Date: February 29, 2000 Project No.: 0791-2208 SAMPLE DATE: February 17, 2000 CONTRACTOR: Dal Mac TICKET NO.: 83559 AMBIENT TEMP. (°F): 62 CONCRETE TEMP. (°F) (ASTM C.t064): 69 TIME BATCHED: 6:15 TIME SAMPLED: 7:00 WEATHER CONDITION: Partly cloudy LOCATION OF PLACEMENT: CONCRETE SUPPUER: Lattimore PLANT/TRUCK: 7/956 MIX ID NUMBER: 16 AIR (%) (ASTM C-231): WATER ADDED (gal): 0 SLUMP (in.) (ASTM C-143): 4.5 Slab, upper area of Area C of Multi purpose Building at southwest corner CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square Inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 648 7 02/24/00 87000 3080 3000/28 days CHC 649 28 03/16/00 CHC 650 28 03/16/00 CHC 651 Hold Fracture mode is (A) unless olberwtse no~ Specifications: Making & ASTM C-31 Testing ASTM C-143. Typesof ~] ~] ~ ~ Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: SMH/rm Distribution: David Putman FUGRO SOUTH INC. Reviewed By: ~ DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 520-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Coppetl lSD, c/o Dal - Mac Construction Co. Coppell High School, Multi Purpose Building Coppell, Texas Report Date: February 29, 2000 Project No.: 0791-2208 SAMPLE DATE: February 17, 2000 CONTRACTOR: Dal Mac TICKET NO.: 83548 AMBIENT TEMP. (°F): 66 CONCRETE TEMP. (°F) (ASTM C-1064): 72 TIME BATCHED: 4:23 TIME SAMPLED: 5:05 WEATHER CONDITION: Partly cloudy LOCATION OF PLACEMENT: CONCRETE SUPPLIER: Lattermore PLANT/TRUCK: 7/938 MIX ID NUMBER: 16 AIR (%) (ASTM C-231): WATER ADDED (gal): 0 SLUMP (in.) (ASTM C-143): 4 Slab, upper area of Area C of Multi Purpose Building 45 feet east, 100 feet south from northwest corner CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square Inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 644 7 02/24/00 88000 3110 3000~28 days CHC 645 28 03/16/00 CHC 646 28 03/16/00 CHC 647 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 T..ng ASTM C-143, Typesof ~ m r~ r-1 Curing: Methods: ASTM C-39 Fracture: AV~I I/%J VI LJB c D REMARKS: Technician: David Putman FUGRO SOUTH INC. SMH/rm Distribution: Reviewed By: .~....~ma.~' __ DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford