Loading...
SC-Coppell HS-LR000223FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301: Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Coppell lSD, c/o Dal - Mac Construction Co. Coppell High School, Multi Purpose Building Coppell, Texas Report Date: February 23, 2000 Project No.: 0791-2208 SAMPLE DATE: February 15, 2000 CONTRACTOR: TICKET NO.: * AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C.10S4): TIME BATCHED: TIME SAMPLED: WEATHER CON DITION: LOCATION OF PLACEMENT: Cortez Group 98931 65 73 2:58 3:35 Partly cloudy CONCRETE SUPPLIER: Lattimore PLANT/TRUCK: 3/822 MIX ID NUMBER: 16 AIR (%) (ASTM C-231): WATER ADDED (gal): 10 SLUMP (in.) (ASTM C-14=): 4 Slab, upper half Area C at northeast comer Multi Purpose Building CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 616 7 02/22/00 95000 3360 3000/28 days CHC 617 28 03/14/00 CHC 618 28 03/14/00 CHC 619 Hold Fracture mode is (A) unless Otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof B [~ [~1 ["] Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: David Putman FUGRO SOUTH INC. SMH/rm Distribution: Reviewed By: ~ DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis r Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Tsxas 75229 Ph (972)4848301; Fax (972)620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Coppell lSD, c/o Dal - Mac Construction Co. Coppell High School, Multi Purpose Building Coppell, Texas Report Date: February 23, 2000 Project No.: 0791-2208 SAMPLE DATE: January 25, 2000 CONTRACTOR: Cortez TICKET NO.: 3098233 AMBIENT TEMP. (°F): 58 CONCRETE TEMP. (°F) (ASTM C.1064): 56 TIME BATCHED: 11:52 TIME SAMPLED: 12:25 WEATHER CONDITION: Sunny/Breezy LOCATION OF PLACEMENT: CONCRETE SUPPLIER: Lattimore PLANT/TRUCK: 3 / 735 MIX ID NUMBER: 38 AIR (%) (ASTM C-231): 6 WATER ADDED (gal): - SLUMP (in.) (ASTM C.143): 5-3/4 Pavement - Firelane - Sampled at: Middle of radius from north/south to east/west CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square Inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 508 7 02-01-00 96000 3400 3000/28 days CHC 509 28 02-22-00 119000 4210 CHC 510 28 02-22-00 121000 4280 CHC 511 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM 0-31 Testing ASTM C-143, Typesof ~] ~ [~;1 r-~ curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: Mike Flute FUGRO SOUTH INC. SMH/rm Distribution: Reviewed Bye"-/_~- - "' DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Coppell lSD, c/o Dai - Mac Construction Co. Coppell High School, Multi Purpose Building Coppell, Texas Report Date: February 23, 2000 Project No.: 0791-2208 SAMPLE DATE: January 25, 2000 CONTRACTOR: Cortez TICKET NO.: 7082720 AMBIENT TEMP. (°F): 48 CONCRETE TEMP. (°F) (ASTU C.t0S4): 60 TIME BATCHED: 10:49 TIME SAMPLED: 11:25 WEATHER CONDITION: Cloudy LOCATION OF PLACEMENT: CONCRETE SUPPLIER: Lattimore PLANT/TRUCK: 7 / 757 MIX ID NUMBER: 38 AIR (%) (AS?M C-231): 6 WATER ADDED (gal): - SLUMP (in.) (AS?M C-t43): 5.5 Paving - Fireiane - Samped at: Adjacent to approximate Line L-1 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square Inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (da)rs) TESTED (pounds) (psi) (ps1) CHC 504 7 02-01-00 101000 3570 3000/28 days CHC 505 28 02-22-00 126000 4460 CHC 506 28 02-22-00 128000 4530 CHC 507 Hold Fracture mode is (A) unless ol~lerwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof ~ [~ [~1 r--] curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Unit Weight: 144.4 lbs/cu, ft. Technician: Mike Flute FUGRO SOUTH INC. SMH/rm Distribution: Reviewed By: -~'7. . . DaI-Mac Construction - Damon..Norman City of Coppell - Larry Davis / Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 464-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Coppell lSD, c/o Dal - Mac Construction Co. Coppell High School, Multi Purpose Building Coppell, Texas Report Date: February 23, 2000 Project No.: 0791-2208 SAMPLE DATE: January 25, 2000 r CONTRACTOR: Cortez TICKET NO.: 3098244 AMBIENT TEMP. (°F): 58 CONCRETE TEMP. (°F) (ASTM C-1064): 62 TIME BATCHED: 1:15 TIME SAMPLED: 2:00 WEATHER CONDITION: Sunny/Breezy LOCATION OF PLACEMENT: CONCRETE SUPPLIER: Lattimore PLANT/TRUCK: 3 / 734 MIX ID NUMBER: 38 AIR (%) (ASTM C.231): - WATER ADDED (gal): 15 SLUMP (in.) (ASTM C-143): 6.0 Paving - Firelane - Sampled at: Approximate Line A-8 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 512 7 02-01-00 79000 2790 3000/28 days CHC 513 28 02-22-00 108000 3820 CHC 514 28 02-22-00 106000 3750 CHC 515 Hold Fracture mode is (A) unless ol~erv~se noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof ~ r~ F-~ r--~ Curing: Methods: ASTM C-39 Fracture: AI/Xi I/~J !/'1 I lB C D REMARKS: Technician: Mike Flute FUGRO SOUTH INC. SMH/rm Distribution: Reviewed By: -.~.z DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas ?5229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: February 23, 2000 PROJECT: Coppell High School, Multi Purpose Building Project No.: 0791-2208 Coppell, Texas SAMPLE DATE: February 15, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C.1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Dal Mac / Cortez Group 99009 CONCRETE SUPPLIER: Lattimore 74 PLANT/TRUCK: 3/746 79 MIX ID NUMBER: 42 11:46 AIR (%) (ASTU C.231): 12:40 WATER ADDED (gal): 0 Partly cloudy SLUMP (in.) (ASTM C-143): 4.75 Stadium seating retaining wall, 30 feet east of Line A between grid lines 2 and 23 bottom layer CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square Inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYUNDER AGE DATE LOAD STRENGTH STRENGTH NUMBER {da~/~) TESTED (pounds) (psi) (psi) CHC 632 7 02/22/00 90000 3180 4000128 days CHC 633 28 03/14/00 CHC 634 28 03/14/00 CHC 635 Hold Fracture n-,ode is (A) unless o~,~ noted Specifications: Making & ASTM 0-31 T.ttng ASTM C-143, Typesof ~ [~ ~ ~ Curing: Methods: ASTM C-39 Fracture: A B C D .... REMARKS: Technician: David Putman FUGRO SOUTH INC. SMH/rm Distribution: iii Reviewed By:~ DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. i 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-830'1; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Coppell lSD, c/o Dal - Mac Construction Co. Coppell High School, Multi Purpose Building Coppell, Texas Report Date: February 23, 2000 Project No.: 0791-2208 SAMPLE DATE: February 15, 2000 CONTRACTOR: Cortez Group TICKET NO.: 98937 AMBIENT TEMP. (°F): 63 CONCRETE TEMP. (°F) (ASTM C.'1064): 70 TIME BATCHED: 3:26 TIME SAMPLED: 4:10 WEATHER CONDITION: Partly cloudy LOCATION OF PLACEMENT: CONCRETE SUPPLIER: Lattimore PLANT/TRUCK: 3/1050 MIX ID NUMBER: 16 AIR (%) (ASTM C-231): WATER ADDED (gal): 0 SLUMP (in.) (ASTM C-143): 4.25 Slab, upper half Area C, 5 feet west, 30 feet north from southeast comer, Multi Purpose Building CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square Inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 620 7 02/22/00 103000 3640 30.00/28 days CHC 621 28 03/14/00 CHC 622 28 03/14/00 CHC 623 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM 0-31 Testing ASTM C-143, Typesof [~ [~] ~ 13 Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: David Putman FUGRO SOUTH INC. SMH/rm Distribution: Reviewed By: ~ - DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Coppell lSD, c/o Dal- Mac Construction Co. Coppell High School, Multi Purpose Building Coppell, Texas Report Date: February 23, 2000 Project No.: 0791-2208 SAMPLE DATE: February 15, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C.t0~): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Cortez Group 98942 59 69 3:56 4:50 Partly cloudy CONCRETE SUPPLIER: Lattimore PLANT/TRUCK: 3/968 MIX ID NUMBER: 16 AIR (%) (ASTM C-23t): WATER ADDED (gal): 0 SLUMP (in.) (ASTM C-143): 4 Slab upper half of Area C, 100 feet west, 40 feet north from southeast comer Multi Purpose Building CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square Inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 624 7 02/22/00 101000 3570 3000/28 days CHC 625 28 03/14/00 CHC 626 28 03/14/00 CHC 627 Hold Fracture mode is (A) unless othenvtse noted Specifications: Making & ASTM C'31 Testing ASTM C'143, Typesof ~ ~ [~ F'1 Curing: Melt~ods: ASTM C-39 Fracture: A B C D REMARKS: Technician: David Putman FUGRO SOUTH INC. SMH/rm Distribution: Reviewed By: ~--.~ - DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford