Loading...
SC-Coppell HS-LR000221FUGRO SOUTH, INC. 2880 Vtrgo Lane; P_.=a=s, Texas 75229 Ph (972) 484-~01; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Coppell lSD, c/o Dal - Mac Construction Co. Coppell High School, Multi Purpose Building Coppell, Texas Report Date: February 21, 2000 Project No.: 0791-2208 SAMPLE DATE: January 20, 2000 CONTRACTOR: TICKET NO.: 7082529 AMBIENT TEMP. (°F): 54 CONCRETE TEMP. (°F) (ASTM C-t064): 60 TIME BATCHED: 1:3'6 TIME SAMPLED: 2:18 WEATHER CONDITION: Cold LOCATION OF PLACEMENT: CONCRETE SUPPLIER: PLANT/TRUCK: MIX ID NUMBER: AIR (%) (As'ru c.2=~): WATER ADDED (gal): SLUMP (in.) (ASTM C-~4~): Lalttmom Materials 140 CY/947 10 3.50 Intersection PJ.75 & Line 4 grade beam Multi Purpose BuikJing, Area B CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square Inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 492 7 01/27/00 110000 3890 9000/28 days CHC 493 28 02/17100 139000 4920 CHC 494 28 02117/00 141000 4990 CHC 495 Hold Fracture mode is (A) unless ~ holed Specifications: Maldng, ASTM C-31 Testing ASTM C-143, Typesof ~] [~ [~ [~] Cudng: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: Trey Allen SMH/rm Distribution: FUGRO SOUTH INC. Reviewed By: ~'"~,J~-.---.-~- DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas. Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Coppell lSD. c/o Dal - Mac Construction Co. Coppell High School, Multi Purpose Building Coppell, Texas Report Date: February 21, 2000 Project No.: 0791-2208 SAMPLE DATE: January 21, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTU C-10S4): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: The Cortez Group 3098022 CONCRETE SUPPLIER: Lattimore 58 PLANT/TRUCK: 3 / 972 68 MIX ID NUMBER: (L-42) 9:57 AIR (%) (ASTM C-23t): 4.6 10:45 WATER ADDED (gal): 0 Clear SLUMP (in.) {AST~ C.t43): NIA Slab - Light Weight Concrete - Building "E' CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square Inches TOT,M. COMPRE$81VE SPECIFIED COMPRE881VE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 496 7 01-28-00 70000 2480 3000/28 da~s CHC 497 28 02-18-00 93000 3290 CHC 498 28 02-18-00 95000 3360 CHC 499 Hold Fracture mode is (A) unle. o~en~ hotel Specifications: Making & ASTM 0-31 Tesling ASTM C-143, Type$of [~] B B B Curing: Melhods: ASTM C-39 Fracture: A B C D REMARKS: Technician: SMH/rm Distribution: Greg Forsythe FUGRO SOUTH INC. Reviewed By: t' DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2680 Virgo L.m'm; Dallas, Taxa~ 75229 Ph (972)484-8301; Fax (972) 620-7328 CLIENT: PROJECT: FIELD DENSITY REPORT ' Coppell lSD, c/o Dal - Mac Construction Co. REPORT DATE: February 21, 2000 Coppeil High School, Multi Purpose Building, Coppeil, Texas PROJECT NO: 0791-2208 Density Test Method: Number 1 2 TEST NO. 121 ASTM D-2922 & 3017 MOISTURE/DENSITY RELATIONS Material DescHpflon Red brown sandy clay Brown silty sandy clay with gray shale fragments and some gravel 123 I 117.2 Method,of Compaction: ASTM D-698 Proctor Results Maximum Dry Density (pcf) Optimum Molature (%) 118.6 12.4 114.7~ 12.4 TEST RESULTS PROCTOR LOCATION UNIT DRY NO. WEIGHT 2 Tennis Court subgrade, first two tennis 112.3 courts at northeast corner, first one at northeast corner, 25 feet south, 5 feet west from northeast corner, 1st lift 122 2 Tennis Court subgrade at northeast 113.6 corner, second one west of northeast comer, 25 feet south, 100 feet west from northeast corner, 1st lift Tennis Court subgrade at northeast corner, third one west of northeast corner, natural MOISTURE :, PERCENT OF CONTENT PERCEHT MAXIMUM DENSITY 14.5 97.9 13.1 99.0 13.3 98.8 Remarks: All densities meet project specifications unless otherwise noted. David Putman Fugro South Technician FUGRO SOUTH INC. SMH/bg Distribution: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD -Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford Reviewed By: