SC-Coppell HS-LR000216FUGRO SOUTH, INC.
2M0 Virgo Lane; Dallas, Taxa~ 75229
Ph (9/2)484.8301; ;ax (9/2)620-7328
OBSERVATION OF CONCRETE PLACEMENT
CLIENT:
PROJECT:
Coppell lSD, c/o Dal - Mac Construction Co.
Coppetl High School, Multi Purpose Building
Coppell, Texas
Report Date: February 16. 2000
Project No.: 0791-2208
DATE pERFoRMED:
General Contractor: Cortez
Method of Test:
Applicable ACI Recommendations and ASTM Standards
Results I Remarks:
Concrete placement observation was performed at the Upper half of Area "C" on multi-purpose building slab
following location:
Time placement began:
Time placement ended:
Total cubic yards placed:
Slump range (inches):
Slump required (inches):
Concrete supplier and plant:
Concrete temperature range (°F):
Strength required (psi/days):
Number of cylinders made:
Superplasticizer used:
3:00
9:45
200
3.75 to 4.5
5.0
Lattimore - Plant No. 3
OF
3000/28
16
No
David Putman
Fugro South Technician
FUGRO SOUTH, INC.
SMH/bg
Distribution:
Reviewed By:
DaI-Mac Construction - Damon Norman
City of Coppell - Larry Davis
Coppetl lSD - Mickey Harper
SHW Group - Joe Craddock
SHW Group - Mike Elmore