Loading...
SC-Coppell HS-LR000216FUGRO SOUTH, INC. 2M0 Virgo Lane; Dallas, Taxa~ 75229 Ph (9/2)484.8301; ;ax (9/2)620-7328 OBSERVATION OF CONCRETE PLACEMENT CLIENT: PROJECT: Coppell lSD, c/o Dal - Mac Construction Co. Coppetl High School, Multi Purpose Building Coppell, Texas Report Date: February 16. 2000 Project No.: 0791-2208 DATE pERFoRMED: General Contractor: Cortez Method of Test: Applicable ACI Recommendations and ASTM Standards Results I Remarks: Concrete placement observation was performed at the Upper half of Area "C" on multi-purpose building slab following location: Time placement began: Time placement ended: Total cubic yards placed: Slump range (inches): Slump required (inches): Concrete supplier and plant: Concrete temperature range (°F): Strength required (psi/days): Number of cylinders made: Superplasticizer used: 3:00 9:45 200 3.75 to 4.5 5.0 Lattimore - Plant No. 3 OF 3000/28 16 No David Putman Fugro South Technician FUGRO SOUTH, INC. SMH/bg Distribution: Reviewed By: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppetl lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford