SC-Coppell HS-LR000211FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: February 11,2000 Coppell High School, Multi Purpose Building Project No,: 0791-2208 Coppell, Texas SAMPLE DATE: January 13, 2000 CONTRACTOR: Cortez TICKET NO.: 7082192 AMBIENT TEMP. (°F): 72 CONCRETE TEMP. (°F) (ASTM C.10S4): 78 TIME BATCHED: 2:03 TIME SAMPLED: 3:10 WEATHER CONDITION: LOCATION OF PLACEMENT: CONCRETE SUPPLIER: Lattimore PLANT/TRUCK: 7/1042 MIX ID NUMBER: 16 AIR (%) (ASTM C-23'1): WATER ADDED (gal): 10 Sunny SLUMP (in.) (ASTM C.t43): 5 1/4 Grade beams, Area B, sampled at K-12 (approximately) CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square Inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (ps!) (psi) CHC 484 7 01/20/00 100000 3540 3000/28 days CHC 485 28 02/10/00 121000 4280 , .. CHC 486 28 02/10100 123000 .. 4350 CHC 487 Hold Fracture mode is (A) unless otherwise Specifications: Making & ASTM C-31 Testing ASTM C'143, Types°f ~] [~ [~1 r'--] curing: Melt~ods: ASTM C-39 Fracture: A B C D, REMARKS: Technician: Mike Flute FUGRO SOUTH INC. SMH/kp Distribution: Reviewed By: ~ DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 CLIENT: PROJECT: Ph (972) 484-8301; Fax (972) 620-7328 OBSERVATION OF CONCRETE PLACEMENT Coppell lSD, c/o Dal - Mac Construction Co. Report Date: February 11, 2000 Coppell High School, Multi Purpose Building Project No.: 0791-2208 Coppetl, Texas DATE.PERFORMED: February 10, 2000. General Contractor: Cortez Method of Test: Applicable ACl Recommendations and ASTM Standards Results / Remarks: Concrete placement observation was performed at the following location: Time placement began: Time placement ended: Total cubic yards placed: Slump range (inches): Slump required (inches): Concrete supplier and plant: Concrete temperature range (°F): Strength required (psi/days): Number of cylinders made: Superplasticizer used: Slab - Multi-Purpose Building - Lower half of Area C 3:00 5:15 220 4.0 to 5.5 5.0 Lattimore - Plant No. 7 70OF 3000/28 16 No David Putman Fugro South Technician FUGRO SOUTH, INC. SMH/bg Distribution: Reviewed By: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike EImore JRJ Paving - Jeff Williford