SC-Coppell HS-LR000207FUGRO SOUTH, INC.
CLIENT:
PROJECT:
2880 Vlrgo I..~rm; D~IIM, Tex~s 75229
Ph (972) 484-8301; Fax (972) ff20-7328
OBSERVATION OF CONCRETE PLACEMENT
Coppell lSD, c/o Dal - Mac Construction Co.
Coppell High School, Multi Purpose Building
Coppell, Texas
Report Date: Februay 7, 2000
Project No.: 0791-2208
DATE PERFORMED: February 4, 2000 .
General Contractor: Cortez
Method of Test:
Applicable ACl Recommendations and ASTM Standards
Results I Remarks:
Concrete placement observation was performed at the West side of multi-purpose building
following location:
Time placement began:
Time placement ended:
Total cubic yards placed:
Slump range (inches):
Slump required (inches):
Concrete supplier and plant:
Concrete temperature range (°F):
Strength required (psi/days):
Number of cylinders made:
Superplasticizer used:
3:O0
9:00
300
4.0 to 6.0
5.0
Lattimore - Plant No. 3
53 - 59°F
3000/28
20
No
David Putman
Fugro South Technician
FUGRO SOUTH, INC.
SMH/bg
Distribution:
Reviewed By:
DaI-Mac Construction - Damon Norman
City of Coppell - Larry Davis
Coppell lSD - Mickey Harper
SHW Group - Joe Craddock
SHW Group - Mike Elmore
JRJ Paving - Jeff Williford