Loading...
SC-Coppell HS-LR000207FUGRO SOUTH, INC. CLIENT: PROJECT: 2880 Vlrgo I..~rm; D~IIM, Tex~s 75229 Ph (972) 484-8301; Fax (972) ff20-7328 OBSERVATION OF CONCRETE PLACEMENT Coppell lSD, c/o Dal - Mac Construction Co. Coppell High School, Multi Purpose Building Coppell, Texas Report Date: Februay 7, 2000 Project No.: 0791-2208 DATE PERFORMED: February 4, 2000 . General Contractor: Cortez Method of Test: Applicable ACl Recommendations and ASTM Standards Results I Remarks: Concrete placement observation was performed at the West side of multi-purpose building following location: Time placement began: Time placement ended: Total cubic yards placed: Slump range (inches): Slump required (inches): Concrete supplier and plant: Concrete temperature range (°F): Strength required (psi/days): Number of cylinders made: Superplasticizer used: 3:O0 9:00 300 4.0 to 6.0 5.0 Lattimore - Plant No. 3 53 - 59°F 3000/28 20 No David Putman Fugro South Technician FUGRO SOUTH, INC. SMH/bg Distribution: Reviewed By: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford