Loading...
SC-Coppell HS-LR000204~O FUGRO SOUTH, INC. 2680 V~rgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; FaX (972) 620-7328 GENERAL REPORT CLIENT: PROJECT: Coppell lSD, c/o Dal - Mac Construction Co. Report. Date: February 4, 2000 Coppell High School, Multi Purpose Building Project No.: 0791-2208 Coppell, Texas DAILY ACTIVITY REPORT: February 1,2000 . Services Performed: visual Inspection Weather Conditions: Overcast/Cloudy Contractors on Site: Cortez / DaI-Mac Remarks: On this date, a representative of Fugro South, Inc. was present on the above mentioned project to perform the following tests and observations as requested: · 1) Observed drilling of piers for Stadium · 2) Made 4 cylinders · 3) Picked-up proctor for new north parking lot Mike Flute Fugro South Technician FUGRO SOUTH, INC. David A. Belcher, P.E, Sr. Project Manager SMH/bg Distribution: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis J Coppell lSD -Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. Ro 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 4848301; Fax (972) 620-7328 DRILLED PIER OBSERVATION REPORT CLIENT: Coppell lSD, c/o Dal- Mac Construction Co. PROJECT: Coppell High School, Multi Purpose Building, Coppell, Texas DRILLING CONTRACTOR: Street Foundation Report Date: February 4, 2000 Project No.: 0791-2208 Page I i DATE PERFORMED: FebruarY t' 2000~ I Location: Drilled Piers A-5-21 36 16.8 4.0 4.0 20.8 Yes Yes No #42 A-21 36 17.3 7.0 7.0 24.3 Yes No No #.41 B-21 36 19.7 10.0 10.1 29.8 Yes No No #~t0 A-5-22 36 17.5 4.0 4.1 21.6 Yes Yes No #54 A-22 36 17.6 4.0 4.0 21.6 Yes Yes No #56 B-22 36 17.5 10.0 10.0 27.5 Yes No No #48 A-7-22.7 18 19.6 4.0 4.0 23.6 Yes No No #59 A-6-24 18 18.6 4.0 4.1 22.7 Yes No No #57 A-6-23.5 18 19.0 4.0 4.1 23.1 Yes No No #58 Reinforcing steel checked in all piers and found to be in accordance with project requirements, unless otherwise noted. Bearing Material: Gray Shale m During drilling operations; however, piers were dry prior to placement of concrete. Mike Flute Fugro Technician FUGRO SOUTH INC. Reviewed By: SMH/bg Distribution: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 288~ Vtrgo Lane; D~_,?_~. T-~x-=s 75229 Ph (972) 484.8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. ~. Report Date: February 4, 2000 PROJECT: Coppell High School, Multi Purpose Building Project No.: 0791-2208 Coppell, Texas SAMPLE DA1 =: January 7, 2000 CONTRACTOR: The Cortez Group TICKET NO.: 7082032 AMBIENT TEMP. (°F): 55 CONCRETE TEMP. (°F) (ASTM C.10S4): 73 TIME BATCHED: 3:17 TIME SAMPLED: 4:20 WEATHER CONDITION: Rain LOCATION OF PLACEMENT: CONCRETE SUPPLIER: Lattimore PLANT/TRUCK: 7/646 MIX ID NUMBER: 16 AIR (%) (ASTM C-23t): WATER ADDED (gal): 5 SLUMP (in.) (ASTM C.143): 5 Grade beam, Line A-1 at AJ - CONCRETE CYLINDER COMPRESSIVE STRENGTH !/SSTS Standard 6" x 12", 28.27 square Inches TOTAL COMPRESSIVE SPECIFIED COMPRE~iVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUM_RER (days) TESTED (pounds) (psi) (psi) CHC 476 7 01/14/00 118000 4170 3000/28 days CHC 477 28 02/04/00 149000 5270 CHC 478 28 02/04/00 146000 5160 CHC 479 Hold Frec_hJre ~T.7.~e is (A) unless Ou .~,-wise, ..._..._--_. Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof ~ [~ [~ [~] Curing: Methods: ASTM C-39 Fracture: A B . C D REMARKS: Technician: Greg Forsythe FUGRO SOUTH INC. Reviewed By: SMH/rm Distribution: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: February 4, 2000 PROJECT: Coppell High School, Multi Purpose Building Project NO.'- 0791-2208 Coppell, Texas SAMPLE DATE: January 7, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C.¶064): TIME BATCHED: TIME SAMPLED: W-mATHER CONDITION: LOCATION OF PLACEMENT: The Cortez Group 3097418 56 71 2:29 3:20 Raining CONCRETE SUPPLIER: Lattimore PLANT/TRUCK: 3/761 MIX ID NUMBER: 16 AIR (%) (ASTU C-231): WATER ADDED (gal): 0 SLUMP (in.) (AS?M C.t43): 5 Grade beam, Line A-N at A2 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square Inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (ps1) CHC 472 7 01/14/00 113000 4000 3000/28 days CHC 473 28 02/04/00 148000 5240 CHC 474 28 02/04/00 150000 5310 CHC 475 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM 0-143, Types°f [~ [~] [~ r'-] curing: Melhods: ASTM C-39 Fracture: A B C D REMARKS: Technician: Greg Forsythe FUGRO SOUTH INC. SMH/rm Distribution: Reviewed By: ~ DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: February 4, 2000 PROJECT: Coppell High School, Multi Purpose Building Project No.: 0791-2208 Coppell, Texas SAMPLE DATE: January 7, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C-t064): TiME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: The Cortez Group 7081941 57 72 1:04 2:00 Cloudy CONCRETE SUPPLIER: Lattimore PLANT/TRUCK: 7~959 MIX ID NUMBER: 16 AIR (%) (ASTM C-231): WATER ADDED (gal): 5 SLUMP (in.) (ASTM C.143): 5 Grade beam, Line A-1 at AG CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square Inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 468 7 01/14/00 111000 3930 3000/28 days CHC 469 28 02/04/00 154000 5450 CHC 470 28 02/04/00 151000 5340 CHC 471 Hold Fracture mode is (A) Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof ~] [~ [~] ["'] Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: Greg Forsythe FUGRO SOUTH INC. Reviewed By: .... ~ SMH/rm Distribution: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford