Loading...
SC-Coppell HS-LR000126FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 CLIENT: PROJECT: Ph (972) 484-8301; Fax (972) 620-7328 OBSERVATION OF CONCRETE PLACEMENT Coppell lSD, c/o Dal - Mac Construction Co. Coppell High School, Multi Purpose Building Coppell, Texas DATE PERFORMED: Report Date: January 26, 2000 Project No.: 0791-2208 January 25, 2000 General Contractor: DaI-Mac Method of Test: Applicable ACI Recommendations and ASTM Standards Results / Remarks: Concrete placement observation was performed at the Firelane from Line N-1 to Parking Area following location: Line N-9 to Line A-18 Time placement began: Time placement ended: Total cubic yards placed: Slump range (inches): Slump required (inches): Concrete supplier and plant: Concrete temperature range (°F): Strength required (psi/days): Number of cylinders made: Superplasticizer used: 10:30 a.m. 5:00 p.m. 320 5.0 - 6.0 5+1 Lattimore - Plant Nos. 3 & 48 55 - 65°F 3000/28 12 No Mike Flute Fugro South Technician FUGRO SOUTH, INC. SMH/bg Distribution: Reviewed By: DaI-Mac Construction - Damon Norman -City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike EImore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 CLIENT: PROJECT: FIELD DENSITY REPORT Coppell lSD, c/o Dal - Mac Construction Co. REPORT DATE: January 26, 2000 Coppell High School, Stadium Expansion, Coppell, Texas PROJECT NO: 0791-2208 DATE PERFORMED: Density Test Method: Number 1 2 ASTM D-2922 & 3017 MOISTURE/DENSITY RELATIONS Material Oescription Maximum Dry Density (pcf) Red brown clayey sand (select) 116.9 Red silty sand with some dark gray clay 119.4 TEST RESULTS TEST PROCTOR NO. NO. 107 2 108 1 LOCATION 8 inch sanitary sewer, station 2+20, 5 feet below grade 8 inch sanitary sewer, station 2+20, 3 feet below grade 8 inch sanitary sewer, station 2+20, 1 foot below grade Method of Compaction: ASTM D-698 Proctor Results Optimum Moisture (%) 13.5 12.2 UNIT DRY MOISTURE PERCENT OF WEIGHT CONTENT PERCENT MAXIMUM DENSITY 116.2 13.1 97.3 109 1 114.0 12.1 97.5 110.6 14.9 95.0 Remarks: All densities meet project specifications unless otherwise noted. Mike Flute Fugro South Technician FUGRO SOUTH INC. SMH/bg Distribution: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford Reviewed By: