SC-Coppell HS-LR000125FUGRO SOUTH, INC.
CLIENT:
PROJECT:
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
OBSERVATION OF CONCRETE PLACEMENT
Coppetl lSD, c/o Dal- Mac Construction Co.
Coppell High School, High School Expansion
Coppell, Texas
DATE PERFORMED:
Report Date: January 25, 2000
Project No.: 0791-2208
January 21, 2000
General Contractor: DaI-Mac
Method of Test:
Applicable ACI Recommendations and ASTM Standards
Results I Remarks:
Concrete placement observation was performed at the Slab - Building E in High School
following location:
Time placement began:
Time placement ended:
Total cubic yards placed:
Slump range (inches):
Slump required (inches):
Concrete supplier and plant:
Concrete temperature range (°F):
Strength required (psi/days):
Number of cylinders made:
Superplasticizer used:
10:30 a.m.
11:30 a.m.
9.0
5.0 - 5.5
N/A
Lattimore - Plant No. 3
73 - 74°F
3000/28
4
No
Greg Forsythe
Fugro South Technician
FUGRO SOUTH, INC.
SMH/bg
Distribution:
Reviewed By:
DaI-Mac Construction - Damon Norman
City of Coppell - Larry Davis
Coppell lSD - Mickey Harper
SHW Group - Joe Craddock
SHW Group - Mike Elmore
JRJ Paving - Jeff Williford
FUGRO SOUTH, INC.
CLIENT:
PROJECT:
2880 virgo Lane; Dallas, Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
OBSERVATION OF CONCRETE PLACEMENT
Coppell lSD, c/o Dal - Mac Construction Co. Report Date: January 25, 2000
Coppell High School, Multi Purpose Building Project No.: 0791-2208
Coppell, Texas
DATE PERFORMED: January 21, 2000
General Contractor: DaI-Mac
Method of Test:
Applicable ACI Recommendations and ASTM Standards
Results / Remarks:
Concrete placement observation was performed at the Paving - Parking area behind stadium on west side,
following location: southeast comer patch behind batting cage
Time placement began:
Time placement ended:
Total cubic yards placed:
Slump range (inches):
Slump required (inches):
Concrete supplier and plant:
Concrete temperature range (°F):
Strength required (psi/days):
Number of cylinders made:
Superplasticizer used:
1:00 a.m.
4:00 p.m.
30
5.0 - 5.5
5.0
Lattimore - Plant No. 3
74 - 75°F
3000/28
4
No
Greg Forsythe
Fugro South Technician
FUGRO SOUTH, INC.
SMH/bg
Distribution:
Reviewed By:
DaI-Mac Construction - Damon Norman
City of Coppell - Larry Davis
Coppell lSD - Mickey Harper
SHW Group - Joe Craddock
SHW Group - Mike Elmore
JRJ Paving - Jeff Williford