Loading...
SC-Coppell HS-LR000125FUGRO SOUTH, INC. CLIENT: PROJECT: 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 OBSERVATION OF CONCRETE PLACEMENT Coppetl lSD, c/o Dal- Mac Construction Co. Coppell High School, High School Expansion Coppell, Texas DATE PERFORMED: Report Date: January 25, 2000 Project No.: 0791-2208 January 21, 2000 General Contractor: DaI-Mac Method of Test: Applicable ACI Recommendations and ASTM Standards Results I Remarks: Concrete placement observation was performed at the Slab - Building E in High School following location: Time placement began: Time placement ended: Total cubic yards placed: Slump range (inches): Slump required (inches): Concrete supplier and plant: Concrete temperature range (°F): Strength required (psi/days): Number of cylinders made: Superplasticizer used: 10:30 a.m. 11:30 a.m. 9.0 5.0 - 5.5 N/A Lattimore - Plant No. 3 73 - 74°F 3000/28 4 No Greg Forsythe Fugro South Technician FUGRO SOUTH, INC. SMH/bg Distribution: Reviewed By: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. CLIENT: PROJECT: 2880 virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 OBSERVATION OF CONCRETE PLACEMENT Coppell lSD, c/o Dal - Mac Construction Co. Report Date: January 25, 2000 Coppell High School, Multi Purpose Building Project No.: 0791-2208 Coppell, Texas DATE PERFORMED: January 21, 2000 General Contractor: DaI-Mac Method of Test: Applicable ACI Recommendations and ASTM Standards Results / Remarks: Concrete placement observation was performed at the Paving - Parking area behind stadium on west side, following location: southeast comer patch behind batting cage Time placement began: Time placement ended: Total cubic yards placed: Slump range (inches): Slump required (inches): Concrete supplier and plant: Concrete temperature range (°F): Strength required (psi/days): Number of cylinders made: Superplasticizer used: 1:00 a.m. 4:00 p.m. 30 5.0 - 5.5 5.0 Lattimore - Plant No. 3 74 - 75°F 3000/28 4 No Greg Forsythe Fugro South Technician FUGRO SOUTH, INC. SMH/bg Distribution: Reviewed By: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford