Loading...
SC-Coppell HS-LR000118FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 CLIENT: PROJECT: FIELD DENSITY REPORT Coppell lSD, c/o Dal - Mac Construction Co. REPORT DATE: January 18, 2000 Coppell High School, Multi Purpose Building, Coppell, Texas PROJECT NO: 0791-2208 DATE PERFORMED: January 14, 2000 Density Test Method: Number 1 2 ASTM D-2922 & 3017 MOISTURE/DENSITY RELATIONS Material Description Red brown clayey sand (select) Dark gray clay with some gravel TEST PROCTOR NO. NO. 77 1 78 1 79 1 8O 1 81 1 82 2 83 2 LOCATION Method of Compaction: ASTM D-698 Proctor Results Maximum Dry Density (pcf) TEST RESULTS UNIT DRY WEIGHT 24 inch RCP Storm Drain, Line A, 111.4 adjacent to R-17 Line, 2 feet below grade 24 inch RCP Storm Drain, Line A, 110.8 adjacent to R-17 Line, final 12 inch PVC Storm Drain, Line F, adjacent 111.2 to M-1 Line, 2 feet below grade 12 inch PVC Storm Drain, Line F, adjacent 110.6 to M-1 Line, final 12 inch PVC Storm Drain, Line E, 2 feet 110.6 below grade 8 inch water line, north of multi-purpose 106.6 on northeast comer, 2 feet below grade 8 inch water line, north of multi-purpose 110.2 on northeast corner, final 116.9 107.4 MOISTURE CONTENT PERCENT 13.5 Optimum Moisture (%) 13.5 17.0 PERCENT OF MAXIMUM DENSITY 95.3 14.3 95.0 14.9 95.1 13.8 95.0 13.6 95.0 16.5 99.2 16.3 102.6 Remarks: All densities meet project specifications unless otherwise noted. Mike Flute Fugro South Technician SMH/bg Distribution: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH INC. Reviewed By: ~-. FUGRO SOUTH, INC. CLIENT: PROJECT: 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 SPRAYED ON FIREPROOFING REPORT Coppell lSD, c/o Dal - Mac Construction Co. Coppell High School, Multi Purpose Building Coppell, Texas Report Date: January 18, 2000 Project No.: 0791-2208 Page 1 DAILY ACTIVITY REPORT: January 14, 2000 Services Performed: Visual Inspection and Thickness / Density Testing, ASTM E-605 Weather Conditions: Sunny Contractors on Site: DaI-Mac Remarks: Sprayed on Fireproofing Thickness / Density Testing was performed at the above referenced project. Locations and results are listed below. Type of Steel Location MeasUred Average ' DenSity Member Thickness (in,) (lbs/cu. ft.) Column BQ-B1,2nd Floor 1-3/4 15.0 Beam BQ-B1,2nd Floor 3/4 15.0 Joist BQ-B1, 2nd Floor 1-1/4 15.0 Deck BQ-B1, 2nd Floor 5/8 15.0 BG-B-1 Column 1-3/4 14.2 BG-B1 Beam 1/2 14.2 BG-B1 Joist 1-1/2 14.2 BG-B1 Deck 1/2 14.2 BK-B5 Column 1-7.8 15.9 BK-B5 Beam 5/8 15.9 BK-B5 Joist 1-3/8 15.9 BK-B5 Deck 1/2 15.9 Column BQ-B5 1-1/2 16.3 Beam BQ-B5 5/8 16.3 Joist BQ-B5 1-1/4 16.3 FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Tex~_~ 75229 Ph (972) 484-8301; Fax (972) 620-7328 SPRAYED ON FIREPROOFING REPORT CLIENT: PROJECT: Coppell lSD, c/o Dal - Mac Construction Co. Coppell High School, Coppell, Texas Report Date: January 18, 2000 Project No.: 0791-2208 Page 2 DAILY ACTIVITY REPORT: January 14, 2000 Type of Steel Location I Measured Average I Density Member Thickness (in.i (lbS/cu. ft.) BQ-B5 Deck 1/2 16.3 BL-B5 Column 1-5/8 14.8 BL-B5 Beam 1/2 14.8 BL-B5 Joist 1-1/4 14.8 BL-B5 Deck 1/2 14.8 Beams - 1/2 in. Minimum Requirement Joist- 15/16 in. Deck - 1/2 in. Columns 1-7/16 in. No deficiencies were observed in the areas which had sprayed on fireproofing material applied. Test results comply with project specifications unless otherwise indicated. Mike Flute Fugro South Technician FUGRO SOUTH, INC. SMH/bg Distribution: Reviewed By: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford