SC-Coppell HS-LR000117FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas. Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, cio Dal - Mac Construction Co. Report Date: January 17, 2000 PROJECT: Coppetl High School, Multi Purpose Building Project NO.: 0791-2208 Coppell, Texas SAMPLE DATE: December 16, 1999 I CONTRACTOR: Cortez TICKET NO.: 9008018 AMBIENT TEMP. (°F): 58 CONCRETE TEMP. (°F) (ASTM C.1064): 72 TIME BATCHED: 2:12 TIME SAMPLED: 3:25 WEATHER CONDITION: Cool LOCATION OF PLACEMENT: Pier #24 CONCRETE SUPPLIER: Lattimore PLANT/TRUCK: 9/990 MIX ID NUMBER: 16 AIR (%) (ASTM C-23t): WATER ADDED (gal): 0 SLUMP (in.) (ASTra C-~45): 4 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 432 7 12/23/99 91820 3250 3000/28 days CHC 433 28 1/13/00 121000 4280 CHC 434 28 1113/00 119000 4210 CHC 435 Hold Fracture mode is (A) unless other,~,s~ noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Types°f [~ [/J~ ~u Cudng: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: SMH/rm Distribution: Thomas Cranford FUGRO SOUTH INC. Reviewed By: ~**"~- *"~.*-'~'"'~"~ DaI-Mac Construction - Dam/on Norman City of Coppell - Larry Davis -- Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford omo FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: January 17, 2000 PROJECT: Coppell High School, Multi Purpose Building Project No.: 0791-2208 Coppell, Texas SAMPLE DATE: December 17, 1999 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C-1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Cortez Group 708166 59 74 2:45 3:40 Cool Piers: Pier ~25 CONCRETE SUPPLIER: Lattimore PLANT/TRUCK: 7/992 MIX ID NUMBER: 16 AIR (%) (ASTM C-231): WATER ADDED (gal): 0 SLUMP (in.) (ASWa C-143): 4 1/4 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square Inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUM_RER (days) TESTED (pounds) (psi) .. (psi) CHC 436 7 12/24/99 94900 3360 3000/28 days CHC 437 28 1/14/00 132000 4670 CHC 438 28 1/14/00 134000 4740 CHC 439 Hold Fracture ~-.3de is (A) un~,~ otherwise ~::1 Specifications: Making & ASTM C-31 Te~ting ASTM C-143, Typesof B [~ [7~ ['-] Cudng: Methods: ASTM C-39 Fracture: A B C D , REMARKS: Technician: Thomas Cranford FUGRO SOUTH INC. eviewed SMH/rm Distribution: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 CLIENT: PROJECT: GENERAL REPORT Coppell lSD, c/o Dal - Mac Construction Co. Coppetl High School, Multi Purpose Building Coppell, Texas Report Date: January 17, 2000 Project No.: 0791-2208 DAILY ACTIVITY REPORT: January 11, 2000 Services Performed: visual Inspection Weather Conditions: Clear Contractors on Site: Tri-Dal Remarks: On this date, a representative of Fugro South, Inc. was present on the above mentioned project to perform the following tests and observations as requested: Upon arrival at the project site, this technician visited DaI-Mac's on-site trailer to speak with the project superintendent. After a short discussion regarding what testing would be required this date, this technician was informed that Tri-Dal needed soil compaction tests over a water line being installed. However, Dave with Tri-Dal advised he was having trouble with ground water seeping into his trenches and would have to alleviate that problem before any density testing could be done, therefore the Tri-Dal Superintendent cancelled testing for this date. Also one select fill proctor was obtained for use at the stadium. David Peters Fugro South Technician FUGRO SOUTH, INC. David~ Sr. Project Manager SMH/bg Distribution: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford