SC-Coppell HS-LR000117FUGRO SOUTH, INC.
2880 Virgo Lane; Dallas. Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Coppell lSD, cio Dal - Mac Construction Co. Report Date: January 17, 2000
PROJECT: Coppetl High School, Multi Purpose Building Project NO.: 0791-2208
Coppell, Texas
SAMPLE DATE: December 16, 1999 I
CONTRACTOR: Cortez
TICKET NO.: 9008018
AMBIENT TEMP. (°F): 58
CONCRETE TEMP. (°F) (ASTM C.1064): 72
TIME BATCHED: 2:12
TIME SAMPLED: 3:25
WEATHER CONDITION: Cool
LOCATION OF PLACEMENT: Pier #24
CONCRETE SUPPLIER: Lattimore
PLANT/TRUCK: 9/990
MIX ID NUMBER: 16
AIR (%) (ASTM C-23t):
WATER ADDED (gal): 0
SLUMP (in.) (ASTra C-~45): 4
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 6" x 12", 28.27 square inches
TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE
CYLINDER AGE DATE LOAD STRENGTH STRENGTH
NUMBER (days) TESTED (pounds) (psi) (psi)
CHC 432 7 12/23/99 91820 3250 3000/28 days
CHC 433 28 1/13/00 121000 4280
CHC 434 28 1113/00 119000 4210
CHC 435 Hold
Fracture mode is (A) unless other,~,s~ noted
Specifications: Making & ASTM C-31 Testing ASTM C-143, Types°f [~ [/J~ ~u
Cudng: Methods: ASTM C-39 Fracture: A B C D
REMARKS:
Technician:
SMH/rm
Distribution:
Thomas Cranford
FUGRO SOUTH INC.
Reviewed By: ~**"~- *"~.*-'~'"'~"~
DaI-Mac Construction - Dam/on Norman
City of Coppell - Larry Davis --
Coppell lSD - Mickey Harper
SHW Group - Joe Craddock
SHW Group - Mike Elmore
JRJ Paving - Jeff Williford
omo
FUGRO SOUTH, INC.
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: January 17, 2000
PROJECT: Coppell High School, Multi Purpose Building Project No.: 0791-2208
Coppell, Texas
SAMPLE DATE: December 17, 1999
CONTRACTOR:
TICKET NO.:
AMBIENT TEMP. (°F):
CONCRETE TEMP. (°F) (ASTM C-1064):
TIME BATCHED:
TIME SAMPLED:
WEATHER CONDITION:
LOCATION OF PLACEMENT:
Cortez Group
708166
59
74
2:45
3:40
Cool
Piers: Pier ~25
CONCRETE SUPPLIER: Lattimore
PLANT/TRUCK: 7/992
MIX ID NUMBER: 16
AIR (%) (ASTM C-231):
WATER ADDED (gal): 0
SLUMP (in.) (ASWa C-143): 4 1/4
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 6" x 12", 28.27 square Inches
TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE
CYLINDER AGE DATE LOAD STRENGTH STRENGTH
NUM_RER (days) TESTED (pounds) (psi) .. (psi)
CHC 436 7 12/24/99 94900 3360 3000/28 days
CHC 437 28 1/14/00 132000 4670
CHC 438 28 1/14/00 134000 4740
CHC 439 Hold Fracture ~-.3de is (A) un~,~ otherwise ~::1
Specifications: Making & ASTM C-31 Te~ting ASTM C-143, Typesof B [~ [7~ ['-]
Cudng: Methods: ASTM C-39 Fracture: A B C D ,
REMARKS:
Technician:
Thomas Cranford
FUGRO SOUTH INC.
eviewed
SMH/rm
Distribution:
DaI-Mac Construction - Damon Norman
City of Coppell - Larry Davis
Coppell lSD - Mickey Harper
SHW Group - Joe Craddock
SHW Group - Mike Elmore
JRJ Paving - Jeff Williford
FUGRO SOUTH, INC.
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
CLIENT:
PROJECT:
GENERAL REPORT
Coppell lSD, c/o Dal - Mac Construction Co.
Coppetl High School, Multi Purpose Building
Coppell, Texas
Report Date: January 17, 2000
Project No.: 0791-2208
DAILY ACTIVITY REPORT: January 11, 2000
Services Performed: visual Inspection
Weather Conditions: Clear
Contractors on Site: Tri-Dal
Remarks: On this date, a representative of Fugro South, Inc. was present on the above mentioned project
to perform the following tests and observations as requested:
Upon arrival at the project site, this technician visited DaI-Mac's on-site trailer to speak with the project
superintendent. After a short discussion regarding what testing would be required this date, this technician was
informed that Tri-Dal needed soil compaction tests over a water line being installed. However, Dave with Tri-Dal
advised he was having trouble with ground water seeping into his trenches and would have to alleviate that
problem before any density testing could be done, therefore the Tri-Dal Superintendent cancelled testing for this
date.
Also one select fill proctor was obtained for use at the stadium.
David Peters
Fugro South Technician
FUGRO SOUTH, INC.
David~
Sr. Project Manager
SMH/bg
Distribution:
DaI-Mac Construction - Damon Norman
City of Coppell - Larry Davis
Coppell lSD - Mickey Harper
SHW Group - Joe Craddock
SHW Group - Mike Elmore
JRJ Paving - Jeff Williford