Loading...
SC-Coppell HS-LR000112FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texa_~ 7~__Pn CLIENT: PROJECT: Ph (972) 484-8301; Fax (972) 620-7328 OBSERVATION OF CONCRETE PLACEMENT Coppell lSD, c/o Dal - Mac Construction Co. Coppell High School, Multi Purpose Building Coppell, Texas DATE PERFORMED: Report Date: January 12, 2000 Project No.: 0791-2208 January7,2000 General Contractor: DaI-Mac Method of Test: Applicable ACI Recommendations and ASTM Standards Results I Remarks: Concrete placement observation was performed at the following location: Time placement began: Time placement ended: Total cubic yards placed: Slump range (inches): Slump required (inches): Concrete supplier and plant: Concrete temperature range (°F): Strength required (psi/days): Number of cylinders made: Superplasticizer used: Grade Beam - Multi-Purpose Building 12:30 p.m. 4:30 p.m. 150 5,0 - 5.5 5.0 Lattimore - Plant Nos. 7 & 3 71 - 74°F 3000/28 12 No Greg Forsythe Fugro South Technician FUGRO SOUTH, INC. SMH/bg Distribution: Reviewed By: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620.7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co, Report Date: January 12, 2000 PROJECT: Coppell High School, Multi Purpose Building Project No.'- 0791-2208 Coppell, Texas SAMPLE DATE: January 4, 2000 CONTRACTOR: Cortez Group TICKET NO.: 3097206 AMBIENT TEMP. (°F): 53 CONCRETE TEMP. (°F) (AS?M C-1064): 66 TIME BATCHED: 2:35 TIME SAMPLED: 3:20 WEATHER CONDITION: Clear LOCATION OF PLACEMENT: CONCRETE SUPPLIER: Lattimore PLANT/TRUCK: 3/819 MIX ID NUMBER: 16 AIR (%) (ASTM C-231): WATER ADDED (gal): 0 SLUMP (in.) (ASWa C-143): 5 Grade beam, Line 15 between A & 5 Multi Purpose Building CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER {days) TESTED (pounds) (psi) (psi) CHC 464 7 01/11/00 105000 3710 3000/28 days CHC 465 28 02/01/00 CHC 466 28 02/01/00 CHC 467 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof [~ [~ [~ [~] Cudng: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: SMH/rm Distribution: Greg Forsythe FUGRO SOUTH INC. Reviewed By: ~ DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford