Loading...
SC-Coppell HS-LR 991221 (2)FUGRO SOUTH, INC. i 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 DRILLED PIER OBSERVATION REPORT REVISED CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. PROJECT: Coppell High School, Multi Purpose Building, Coppell, Texas DRILLING CONTRACTOR: Street Foundation Report Date: December 21, 1999 Project No.: 0791-2208 Page 1 DATE'PERFORMED: December 17, 1999 Location: Drilled Piers - Multi Purpose Building Depth Shaft to Plan Actual Total Pier Diameter Bearing Penetra- Penetra- Depth Proper Water Casing Number in. Material flon ft. tion ft. ft. Alignment Present(~! Used Remarks ft. 132 18 6.5 6.0 6.1 12.6 Yes Yes Yes 143 18 6.0 10.0 10.2 16.2 Yes Yes Yes 140 18 6.0 10.0 10.0 16.0 Yes Yes Yes 134 18 6.5 10.0 10.1 16.6 Yes Yes Yes 131 18 6.5 7.0 7.21 13.7 Yes Yes Yes 135 18 7.0 9.0 9.0 16.0 Yes No No 136 18 8.0 8.0 8.1 16.1 Yes Yes Yes 25 24 7.0 9.0 9.0 16.0 Yes Yes Yes Reinforcing ;teel checked in all piers and found to be in accordance with project requirements, unless otherwise noted. Bearing Material: Gray Shale Revised to clarify location as Multi-Purpose Building (4) During drilling operations; however, piers were dry prior to placement of concrete. Thomas Cranford Fugro Technician FUGRO SOUTH INC. Reviewed By: ~1'1~, . SMH/bg Distribution: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Coppell 1SD, c/o Dal - Mac Construction Co. Coppell High School, Multi Purpose Building Coppell, Texas Report Date: December 21, 1999 Project No.: 0791-2208 SAMPLE DATE: December 10, 1999 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C.1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Cortez Group 3096261 59 72 1:27 4:00 Cool Piers: Pier #.49 CONCRETE SUPPLIER: Lattimore PLANT/TRUCK: 3/1046 MIX ID NUMBER: 16 AIR (%) (ASTM C-231): WATER ADOED (gal): 0 SLUMP (in.) (ASTM C-143): 4 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS. Standard 6" x 12% 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (da~s) TESTED (pounds) (psi) (psi) C HC 428 7 12/17/99 100790 3570 3000/28 days CHC 429 28 1/07/00 CHC 430 28 1/07100 Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143. Typesof [~ ~] ~ ~ Cudng: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: SMH/rm Distribution: Thomas Cranford FUGRO SOUTH INC. Reviewed By: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Copl:;ell lSD, c/o Dal - Mac Construction Co. Coppell High School, Multi Purpose Building Coppell, Texas Report Date: December 21, 1999 Project No.: 0791-2208 SAMPLE DATE: December 8, 1999 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (AS'I'M C-1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: DaI-Mac 7080824 64 67 12:24 1:30 Partly Cloudy Slab: CONCRETE SUPPLIER: Lattimore PLANT/TRUCK: 7 / 1039 MIX ID NUMBER: (16) AIR (%) (ASWa C-231): N/A WATER ADDED (gal): -O- SLUMP (in.) (ASWa C-t43): 5.0 Section 'E" - Slab in front of doorway CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square Inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (da~/s) TESTED (pounds) (psi) (psi) CHC 424 7 12-15-99 78000 2760 3000~28 days. CHC 425 28 1-5-00 CHC 426 28 1-5-00 CHC 427 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM 0-31 Testing ASTM C-143, Typesof ~1 ITl ~'~ [-'] Curing: Methods: ASTM C-39 Fracture: AI/XJ VXJ VI L..JB c D REMARKS: Technician: SMH/rm Distribution: Pompey McGee FUGRO SOUTH INC. Reviewed By: ~"~- DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppelt lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike EImore JRJ Paving - Jeff Williford