SC-Coppell HS-LR 991221 (2)FUGRO SOUTH, INC.
i
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
DRILLED PIER OBSERVATION REPORT
REVISED
CLIENT: Coppell lSD, c/o Dal - Mac Construction Co.
PROJECT: Coppell High School, Multi Purpose Building, Coppell, Texas
DRILLING CONTRACTOR: Street Foundation
Report Date: December 21, 1999
Project No.: 0791-2208
Page 1
DATE'PERFORMED: December 17, 1999
Location: Drilled Piers - Multi Purpose Building
Depth
Shaft to Plan Actual Total
Pier Diameter Bearing Penetra- Penetra- Depth Proper Water Casing
Number in. Material flon ft. tion ft. ft. Alignment Present(~! Used Remarks
ft.
132 18 6.5 6.0 6.1 12.6 Yes Yes Yes
143 18 6.0 10.0 10.2 16.2 Yes Yes Yes
140 18 6.0 10.0 10.0 16.0 Yes Yes Yes
134 18 6.5 10.0 10.1 16.6 Yes Yes Yes
131 18 6.5 7.0 7.21 13.7 Yes Yes Yes
135 18 7.0 9.0 9.0 16.0 Yes No No
136 18 8.0 8.0 8.1 16.1 Yes Yes Yes
25 24 7.0 9.0 9.0 16.0 Yes Yes Yes
Reinforcing ;teel checked in all piers and found to be in accordance with project requirements, unless
otherwise noted.
Bearing Material: Gray Shale
Revised to clarify location as Multi-Purpose Building
(4) During drilling operations; however, piers were dry prior to placement of concrete.
Thomas Cranford
Fugro Technician
FUGRO SOUTH INC.
Reviewed By: ~1'1~, .
SMH/bg
Distribution:
DaI-Mac Construction - Damon Norman
City of Coppell - Larry Davis
Coppell lSD - Mickey Harper
SHW Group - Joe Craddock
SHW Group - Mike Elmore
JRJ Paving - Jeff Williford
FUGRO SOUTH, INC.
2880 virgo Lane; Dallas, Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT:
PROJECT:
Coppell 1SD, c/o Dal - Mac Construction Co.
Coppell High School, Multi Purpose Building
Coppell, Texas
Report Date: December 21, 1999
Project No.: 0791-2208
SAMPLE DATE: December 10, 1999
CONTRACTOR:
TICKET NO.:
AMBIENT TEMP. (°F):
CONCRETE TEMP. (°F) (ASTM C.1064):
TIME BATCHED:
TIME SAMPLED:
WEATHER CONDITION:
LOCATION OF PLACEMENT:
Cortez Group
3096261
59
72
1:27
4:00
Cool
Piers: Pier #.49
CONCRETE SUPPLIER: Lattimore
PLANT/TRUCK: 3/1046
MIX ID NUMBER: 16
AIR (%) (ASTM C-231):
WATER ADOED (gal): 0
SLUMP (in.) (ASTM C-143): 4
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS.
Standard 6" x 12% 28.27 square inches
TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE
CYLINDER AGE DATE LOAD STRENGTH STRENGTH
NUMBER (da~s) TESTED (pounds) (psi) (psi)
C HC 428 7 12/17/99 100790 3570 3000/28 days
CHC 429 28 1/07/00
CHC 430 28 1/07100
Fracture mode is (A) unless otherwise noted
Specifications: Making & ASTM C-31 Testing ASTM C-143. Typesof [~ ~] ~ ~
Cudng: Methods: ASTM C-39 Fracture: A B C D
REMARKS:
Technician:
SMH/rm
Distribution:
Thomas Cranford
FUGRO SOUTH INC.
Reviewed By:
DaI-Mac Construction - Damon Norman
City of Coppell - Larry Davis
Coppell lSD - Mickey Harper
SHW Group - Joe Craddock
SHW Group - Mike Elmore
JRJ Paving - Jeff Williford
FUGRO SOUTH, INC.
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT:
PROJECT:
Copl:;ell lSD, c/o Dal - Mac Construction Co.
Coppell High School, Multi Purpose Building
Coppell, Texas
Report Date: December 21, 1999
Project No.: 0791-2208
SAMPLE DATE: December 8, 1999
CONTRACTOR:
TICKET NO.:
AMBIENT TEMP. (°F):
CONCRETE TEMP. (°F) (AS'I'M C-1064):
TIME BATCHED:
TIME SAMPLED:
WEATHER CONDITION:
LOCATION OF PLACEMENT:
DaI-Mac
7080824
64
67
12:24
1:30
Partly Cloudy
Slab:
CONCRETE SUPPLIER: Lattimore
PLANT/TRUCK: 7 / 1039
MIX ID NUMBER: (16)
AIR (%) (ASWa C-231): N/A
WATER ADDED (gal): -O-
SLUMP (in.) (ASWa C-t43): 5.0
Section 'E" - Slab in front of doorway
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 6" x 12", 28.27 square Inches
TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE
CYLINDER AGE DATE LOAD STRENGTH STRENGTH
NUMBER (da~/s) TESTED (pounds) (psi) (psi)
CHC 424 7 12-15-99 78000 2760 3000~28 days.
CHC 425 28 1-5-00
CHC 426 28 1-5-00
CHC 427 Hold
Fracture mode is (A) unless otherwise noted
Specifications: Making & ASTM 0-31 Testing ASTM C-143, Typesof ~1 ITl ~'~ [-']
Curing: Methods: ASTM C-39 Fracture: AI/XJ VXJ VI L..JB c D
REMARKS:
Technician:
SMH/rm
Distribution:
Pompey McGee
FUGRO SOUTH INC.
Reviewed By: ~"~-
DaI-Mac Construction - Damon Norman
City of Coppell - Larry Davis
Coppelt lSD - Mickey Harper
SHW Group - Joe Craddock
SHW Group - Mike EImore
JRJ Paving - Jeff Williford