Loading...
SC-Coppell HS-LR 991214FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Coppell lSD, c/o Dal - Mac Construction Co. Coppell High School, Multi Purpose Building Coppeit, Texas Report Date: December 14, 1999 Project No.: 0791-2208 SAMPLE DATE: December 2, 1999 CONTRACTOR: Cortez Group TICKET NO.: 7080613 AMBIENT TEMP. (°F): 62 CONCRETE TEMP. (°F) (AST~ C.10e4): 78 TIME BATCHED: 2:42 TIME SAMPLED: 3:30 WEATHER CONDITION: Cloudy LOCATION OF PLACEMENT: Piers #05 CONCRETE SUPPLIER: Lattimore PLANT/TRUCK: 7/959 MIX ID NUMBER: 16 AIR (%) (ASTM C-231): WATER ADDED (gal): 0 SLUMP (in.) (ASWa C-143): 4 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x t2", 28.27 square Inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 400 7 12/09/99 90000 3180 ,3000/,28 days CHC 401 28 12/30/99 , CHC 402 28 12/30/99 CHC 403 Hold Fracture mode is (A) unless 0theresa noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof ~] [~] ~ ~ Cudng: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: SMH/rm Distribution: Thomas Cranford FUGRO SOUTH INC. Reviewed By: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford