Loading...
SC-Coppell HS-LR000721FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: July 21,2000 PROJECT: Coppell High School, High School Expansion Project NO.: 0791-2208 Coppell, Texas SAMPLE DATE: June 22, 2000 CONTRACTOR: Dal Mac TICKET NO.: 3106955 CONCRETE SUPPLIER: Lattimore AMBIENT TEMP. (°F): 76 PLANT/TRUCK: 3/975 CONCRETE TEMP. (°F) (ASTM C-1064).' 82 MIX ID NUMBER: 38 TIME BATCHED: 8:01 am AIR (%) (ASTM C-231): 5.4 TIME SAMPLED: 8:30 am WATER ADDED (gal): 0 WEATHER CONDITION: Cloudy SLUMP (in.) (ASTM C-143): 4 LOCATION OF PLACEMENT: Paving: Sidewalk area E, at approximately EL/E5 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 1258 7 06/29/00 86700 3070 3000/28 days CHC 1259 28 07/20/00 110000 3890 CHC 1260 28 07/20/00 107700 3810 CHC 1261 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143. Types°f ~ [~ FI E~] Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: Mark Strittmatter FUGRO SOUTH INC. Reviewed By: --- ~I' SMH/rm Distribution: DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone/ City of Coppell Larry Davis`./ Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: July 21,2000 PROJECT: Coppell High School, High School Expansion Project No.: 0791-2208 Coppell, Texas SAMPLE DATE: June 22, 2000 CONTRACTOR: Dal Mac Construction TICKET NO.: 3106987 CONCRETE SUPPLIER: Lattimore AMBIENT TEMP. (°F): 85 PLANT/TRUCK: 3/819 CONCRETE TEMP. (°F) (ASTM C-10S4): 80 MIX ID NUMBER: 38 TIME BATCHED: 10:28 am AIR (%) (ASTM C-231): 4.8 TIME SAMPLED: 11:05 am WATER ADDED (gal): 0 WEATHER CONDITION: Cloudy SLUMP (in.) (ASTM C-143): 4.50 LOCATION OF PLACEMENT: Paving: Sidewalk area E at approxinately EE/E3.2 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 1262 7 06/29/00 82400 2910 3000/28 days CHC 1263 28 07/20/00 102000 3610 CHC 1264 28 07/20/00 99700 3510 CHC 1265 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof ~;] ~ ~ r-'] Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: Mark Strittmatter FUGRO SOUTH INC. Reviewed By: -'~ ~' SMH/rm Distribution: DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford