SC-Coppell HS-LR000705FUGRO SOUTH, INC. 28~0 Vi~go Lane; D~llas, Tex_=~_ 75229 Ph (972) ~1; Fax (972) $20-7328 OBSERVATION OF CONCRETE PLACEMENT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: July 5, 2000 PROJECT: Coppell High School. High School Expansion Project No.: 0791-2206 Coppell, Texas DATE PERFORMED: June 28, 2000 General Contractor: The Cortez Group Method of Test: Applicable ACI Recommendations and ASTM Standards Results / Remarks: Concrete placement observation was performed at the Ground level grade beams at 5-6 - C-B and 4 & 3 & 2 - following location: C-B Time placement began: 6:30 a.m. Time placement ended: 7:30 a.m. Total cubic yards placed: 20 Slump range (inches): 3.0 - 4.0 Slump required (inches): 5.0 Concrete supplier and plant: Lattimore - Plant No. 3 Concrete temperature range (°F): 84 - 86°F Strength required (psi/days): 3000/28 Number of cylinders made: 4 Superplasticizer used: No Sammy Roberts Fugro South Technician FUGRO SOUTH, INC. Reviewed By: '~'~' "'"~,'~,<-------~ SMH/bg Distribution: DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2~0 Vlrgo Lane; Dallas. Texas 75229 Ph (972) 4~4-8301; Fax (972) 620-7328 REINFORCING STEEL PLACEMENT OBSERVATION CLIENT: Coppell lSD, ~o Dal- Mac Construction Co. Report Date: July 5, 2000 PROJECT: Coppell High School, High School Expansion Project No.: 0791-2208 Coppell, Texas DATE PERFORMED: June 28, 2000 I General Contractor: The Cortez Group Method of Test: Applicable ACI Recommendations and ASTM Standards Results ! Remarks: On the above sample date, a representative of Fugro South observed the reinforcing steel placed at the following location: · Grade Beams - 5 & 6 - C-B · Grade Beams-4&3&2-C-B The steel was checked for proper size, grade, quantity, vertical location, horizontal spacing, correctness of bends and splices, firmness and security of support and ties and clearances between reinforcement and forms. The following discrepancies were noted: · Bars burning forms at Grade Beams 5 - C through B The above discrepancies were corrected prior to concrete placement. Sammy Roberts Fugro South Technician FUGRO SOUTH, INC. Reviewed By: ~ - ~- SMH/bg Distribution: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford