Loading...
SC-Coppell HS-LR000703FUGRO SOUTH, INC. 2880 Vlrgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: July 3, 2000 PROJECT: Coppell High School, High School Expansion Project NO.: 0791-2208 Coppell, Texas SAMPLE DATE: June 22, 2000 CONTRACTOR: Dal Mac Construction TICKET NO.: 3106987 CONCRETE SUPPLIER: Lattimore AMBIENT TEMP. (°F): 85 PLANT/TRUCK: 3/819 CONCRETE TEMP. (°F) (ASTM C-1064): 80 MIX ID NUMBER: 38 TIME BATCHED: 10:28 am AIR (%) (AST¥ C-231): 4.8 TIME SAMPLED: 11:05 am WATER ADDED (gal): 0 WEATHER CONDITION: Cloudy SLUMP (in.) (ASTM C-143): 4.50 LOCATION OF PLACEMENT: Paving: Sidewalk area E at approxinately EE/E3.2 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 1262 7 06/29/00 82400 2910 3000/28 days CHC 1263 28 07/20/00 CHC 1264 28 07/20/00 CHC 1265 Hold Fracture mode is (A) unless othen~vise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof ~;;1 ~['] ~--~ ~--] Curing: Methods: ASTM C-39 Fracture: AVXJ VXJ V~ LiB C D REMARKS: Technician: Mark Strittmatter FUGRO SOUTH INC. Reviewed By: SMH/rm Distribution: DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell- Larry Davisj Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: July 3, 2000 PROJECT: Coppell High School, High School Expansion Project No.: 0791-2208 Coppell, Texas SAMPLE DATE: June 22, 2000 I CONTRACTOR: Dal Mac TICKET NO.: 3106955 CONCRETE SUPPLIER: Lattimore AMBIENT TEMP. (°F): 76 PLANT/TRUCK: 3/975 CONCRETE TEMP. (°F) (ASTM C.t064): 82 MIX ID NUMBER: 38 TIME BATCHED: 8:01 am AIR (%) (ASTM C-231): 5.4 TIME SAMPLED: 8:30 am WATER ADDED (gal): 0 WEATHER CONDITION: Cloudy SLUMP (in.) (ASTM C-143): 4 LOCATION OF PLACEMENT: Paving: Sidewalk area E, at approximately EE/E5 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 1258 7 06/29~00 86700 3070 3000~28 days CHC 1259 28 07/20/00 CHC 1260 28 07/20/00 CHC 1261 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof ~] ~ ~ ~ Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: Mark Strittmatter FUGRO SOUTH INC. Reviewed By: ~- / SMH/rm Distribution: DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972)484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: July 3, 2000 PROJECT: Coppell High School, High School Expansion Project No.: 0791-2208 Coppell, Texas I SAMPLE DATE: June 2, 2000 I CONTRACTOR: Cortez Group TICKET NO.: 7087868 CONCRETE SUPPLIER: Lattimore AMBIENT TEMP. (°F): 76 PLANT/TRUCK: 7/1039 CONCRETE TEMP. (°F) (ASTM C-1064): 84 MIX ID NUMBER: 38 TIME BATCHED: 6:06 AIR (%) (ASTM C-23'1): TIME SAMPLED: 7:00 WATER ADDED (gal): 0 WEATHER CONDITION: Warm SLUMP (in.) (ASTM C.143): 4 LOCATION OF PLACEMENT: Sidewalk west side building at Lecture Building, 3 feet west, 25 feet south CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds). (psi) (psi) CHC 1226 7 06/09/00 73000 2580 3000/28 days CHC 1227 28 06/30/00 103800 3670 CHC 1228 28 06/30/00 102600 3630 CHC 1229 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM 0-31 Testing ASTM C-143. Typesof [~ [~ [~ Cudng: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: Thomas Cranford FUGRO SOUTH INC. Reviewed By:~,,-~r- ~ SMH/kw Distribution: DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford