OBSERVATION OF CONCRETE PLACEMENT
CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: June 26, 2000
PROJECT: Coppell High School, High School Expansion Project No.: 0791-2208
Coppell, Texas
DATE PERFORMED: June 22, 2000 I
General Contractor: Dal Mac
Method of Test: Applicable ACI Recommendations and ASTM Standards
Results I Remarks:
Concrete placement observation was performed at the Paving sidewalk on east side of Area E from ED to EE
following location: from Line E3 to E6
Time placement began: 8:00 a.m.
Time placement ended: 1:00 p.m.
Total cubic yards placed: 160
Slump range (inches): 4.0 - 5.0
Slump required (inches): 5.0
Concrete supplier and plant: Lattimore - Plant No. 3
Concrete temperature range (°F): 80 - 82°F
Strength required (psi/days): 3000/28
Number of cylinders made: 8
Superplasticizer used: No
Mark Strittmatter
Fugro South Technician
FUGRO SOUTH, INC.
Reviewed By: '-'""~-.
SMH/bg
Distribution: Dal-Mac Construction - Damon Norman