Loading...
SC-Coppell HS-LR000626FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 OBSERVATION OF CONCRETE PLACEMENT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: June 26, 2000 PROJECT: Coppell High School, High School Expansion Project No.: 0791-2208 Coppell, Texas DATE PERFORMED: June 22, 2000 I General Contractor: Dal Mac Method of Test: Applicable ACI Recommendations and ASTM Standards Results I Remarks: Concrete placement observation was performed at the Paving sidewalk on east side of Area E from ED to EE following location: from Line E3 to E6 Time placement began: 8:00 a.m. Time placement ended: 1:00 p.m. Total cubic yards placed: 160 Slump range (inches): 4.0 - 5.0 Slump required (inches): 5.0 Concrete supplier and plant: Lattimore - Plant No. 3 Concrete temperature range (°F): 80 - 82°F Strength required (psi/days): 3000/28 Number of cylinders made: 8 Superplasticizer used: No Mark Strittmatter Fugro South Technician FUGRO SOUTH, INC. Reviewed By: '-'""~-. SMH/bg Distribution: Dal-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford