SC-Coppell HS-LR000622FUGRO SOUTH, INC. ~
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
OBSERVATION OF CONCRETE PLACEMENT
CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: June 22, 2000
PROJECT: Coppell High School, High School Expansion Project No.: 0791-2208
Coppell, Texas
DATE PERFORMED: June 21, 2000 I
General Contractor: The Cortez Group
Method of Test: Applicable ACI Recommendations and ASTM Standards
Results / Remarks:
Concrete placement observation was performed at the Sidewalk - Section E at east side of school
following location:
Time placement began: 7:00 a.m.
Time placement ended: 11:00 a.m.
Total cubic yards placed: 100
Slump range (inches): 5.5 to 6.0
Slump required (inches): 5.0
Concrete supplier and plant: LMC - Plant No. 7
Concrete temperature range (°F): 81 - 82°F
Strength required (psi/days): 3000/28
Number of cylinders made: 8
Superplasticizer used: No
Yancey Bivings
Fugro South Technician
FUGRO SOUTH, INC.
Reviewed By: ~ ~--'~.~
SMH/bg
Distribution: DaI-Mac Construction - Damon Norman
City of Coppell - Lee Stone
City of Coppell - Larry Davis
Coppell lSD - Mickey Harper
SHW Group - Joe Craddock
SHW Group - Mike Elmore
JRJ Paving - Jeff Williford