Loading...
SC-Coppell HS-LR000622FUGRO SOUTH, INC. ~ 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 OBSERVATION OF CONCRETE PLACEMENT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: June 22, 2000 PROJECT: Coppell High School, High School Expansion Project No.: 0791-2208 Coppell, Texas DATE PERFORMED: June 21, 2000 I General Contractor: The Cortez Group Method of Test: Applicable ACI Recommendations and ASTM Standards Results / Remarks: Concrete placement observation was performed at the Sidewalk - Section E at east side of school following location: Time placement began: 7:00 a.m. Time placement ended: 11:00 a.m. Total cubic yards placed: 100 Slump range (inches): 5.5 to 6.0 Slump required (inches): 5.0 Concrete supplier and plant: LMC - Plant No. 7 Concrete temperature range (°F): 81 - 82°F Strength required (psi/days): 3000/28 Number of cylinders made: 8 Superplasticizer used: No Yancey Bivings Fugro South Technician FUGRO SOUTH, INC. Reviewed By: ~ ~--'~.~ SMH/bg Distribution: DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford