Loading...
SC-Coppell HS-LR000621FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 NON - COMPLIANCE REPORT CLIENT: Coppell lSD c/o DaI-Mac Construction Co. DATE: June 21, 2000 PROJECT: Coppell High School, High School Expansion PROJECT NO: 0791-2208 REPORT NO: 16 PAGE 2 Number Description Location Deviate Corrective Action Taken From 1 Item deleted. In Compliance 2 Item deleted. In Compliance 3 Relocated beam due to Higher roof grid Drawings Welded beam connection angles at brick wall. Bolts not EA & ED @ E1 3 places to beam web (Need RFI) 1/14/00 installed in connection beam to beam web 4 1 1/4 pipe supports under Foundation, 2nd Drawings grand stairway not level 2/1/00 installed 5 Mislocation of bolt holes. Elevation Required number of bolts 2/1/00 not installed. Beam to beam connection 2 bolts not installed 6 Grind welds on T.S. to Elevation 106-11 T.S. splice on stringer 2/1/00 NOTE: Architect and Engineer should advise on acceptability of all noted deviations Inspected By: Doug Post, AWS/Certified Welding Inspector, ASNT/Certified Level 2 (UT. MT) STR-1