Loading...
SC-Coppell HS-LR000428FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 820-7328 OBSERVATION OF CONCRETE PLACEMENT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: April 28, 2000 PROJECT: Coppell High School, High School Expansion Project No.: 0791-2208 Coppell, Texas DATE PERFORMED: April 25, 2000 General Contractor: DaI-Mac Method of Test: Applicable ACl Recommendations and ASTM Standards Results I Remarks: Concrete placement observation was performed at the Stadium Retaining Wall -Grid Line D-23 to D-24 following location: Time placement began: 12:30 Time placement ended: 2:00 Total cubic yards placed: 20 Slump range (inches): 5-1/2 to 5-3/4 Slump required (inches): 5_+ Concrete supplier and plant: Lattimore - Plant No. 7 Concrete temperature range (°F): 80 - 85°F Strength required (psi/days): 4000/28 Number of cylinders made: 4 Superplasticizer used: No Mike Flute Fugro South Technician FUGRO SOUTH, INC. Reviewed By: SMH/br Distribution: Dal-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford