SC-Coppell HS-LR000428FUGRO SOUTH, INC.
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484-8301; Fax (972) 820-7328
OBSERVATION OF CONCRETE PLACEMENT
CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: April 28, 2000
PROJECT: Coppell High School, High School Expansion Project No.: 0791-2208
Coppell, Texas
DATE PERFORMED: April 25, 2000
General Contractor: DaI-Mac
Method of Test: Applicable ACl Recommendations and ASTM Standards
Results I Remarks:
Concrete placement observation was performed at the Stadium Retaining Wall -Grid Line D-23 to D-24
following location:
Time placement began: 12:30
Time placement ended: 2:00
Total cubic yards placed: 20
Slump range (inches): 5-1/2 to 5-3/4
Slump required (inches): 5_+
Concrete supplier and plant: Lattimore - Plant No. 7
Concrete temperature range (°F): 80 - 85°F
Strength required (psi/days): 4000/28
Number of cylinders made: 4
Superplasticizer used: No
Mike Flute
Fugro South Technician
FUGRO SOUTH, INC.
Reviewed By:
SMH/br
Distribution: Dal-Mac Construction - Damon Norman
City of Coppell - Lee Stone
City of Coppell - Larry Davis
Coppell lSD - Mickey Harper
SHW Group - Joe Craddock
SHW Group - Mike Elmore
JRJ Paving - Jeff Williford