SC-Coppell HS-LR000114FUGRO SOUTH, INC. ~ 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 SPRAYED ON FIREPROOFING REPORT CLIENT: Coppell lSD, c/o Dal- Mac Construction Co. Report Date: January 14, 2000 PROJECT: Coppell High School, High School Expansion Project No,: 0791-2208 Coppell, Texas DAILY ACTIVITY REPORT: January 10, 2000 Services Performed: Visual Inspection and Thickness / Densib/Testing, ASTM E-605 Weather Conditions: Warm Contractors on Site: DaI-Mac Remarks: Sprayed on Fireproofing Thickness / Density Testing was performed at the above referenced project. Locations and results are listed below. Type of Steel Location Measured Average Density Member Thickness (in.) (lbs/cu. ft.) A10-AA -Bldg. "A" Column 2nd Floor 1-3/4 15.8 A10-AA -Bldg. "A" Beam 2nd Floor 1 15.8 ^10-AA-Bldg. "A"- Joist 2nd Floor 1-1/2 15.8 A-5-AB-Bldg. "A" Column 2nd Floor 1-3/4 15.2 Beam A-5-AB-Bldg. "A" 2nd Floor 1-1/4 15.2 Joist A-5-AB-Bldg. "A" 2nd Floor 1-3/4 15.2 Column Al-AA-Bldg. "A" 2nd Floor 1-1/2 16.4 Beam A-I-AA-Bldg. "A" 2nd Floor 1 16.4 Joist A-I-AA-Bldg. "A" 2nd Floor 1-1/4 16.4 A-5-AG-Bldg. "A" Column 2nd Floor 1-7/8 14.8 A-5-AG Beam 1-5/8 14.8 FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (9?2) 620-?328 SPRAYED ON FIREPROOFING REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: January 14, 2000 PROJECT: Coppell High School, Project No.: 0791-2208 Coppell, Texas Page 2 DAILY ACTIVITY REPORT: January 10, 2000 I Type of Steel Location Measured Average Density Member Thicknes~ (in.) (lbs/cu. ft.) A-5-^G Joist 1-1/4 14.8 A-2-AF Column 1-5/8 17.0 A-2-AF Beam 3/4 17.0 A-2-AF Joist 1-1/16 17.0 A-4-AE Column 1-718 15.6 A-4-AE Beam 1-1/2 15.6 A-4-AE Joist 15/16 15.6 A-6-AD Column 1-3/8 15.0 A-6-AD Beam 1-3/8 15.0 A-6-AD Joist 1-7/16 - Specified Minimum Beams - 1/2 in. Joists - 15/16 in. Columns - 1-7/16 in. No deficiencies were observed in the areas which had sprayed on fireproofing material applied. Test results comply with project specifications unless otherwise indicated. Thomas Cranford Fugro South Technician FUGRO SOUTH, INC. Reviewed By: "'"~ - SMH/bg Distribution: Dal-Mac Construction - Damon Norman SHW Group - Joe Craddock City of Coppell - Larry Davis SHW Group - Mike Elmore Coppell lSD - Mickey Harper JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Vlrgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 STRUCTURAL STEEL INSPECTION REPORT CLIENT: Coppe~l lSD cio Da~-Mac Construction Co. DATE: January 14, 2000 PROJECT: Coppell High School, High School Expansion PROJECT NO: 0791-2208 REPORT NO: 13 PAGE 1 Owner: Coppell lSD Architect: SHW Group Engineer: SHW Group Contractor: DaI-Mac Construction Co. Fabricator: Alpha Industries Location of Project: Coppell, Texas Inspection Performed At: Job Site X Fabrication Shop DESCRIPTIO# OF INSPECTION: Structural Steel Inspection } Visual Inspection of Welds on [Str / Steel - Metal Deck Units) or Ultrasonic Testing or Magnetic Particle Inspection of Welds end Inspection of Bolted Connections for compliance to Project specifications, Contract Documents, Drawings, and Governing Codes } AWS, AISC, ASTM, SJI, ASNT, ANSI. See att=ched Field Reoorts for Specific Items Inspected or Tested and 'l'yoe of Inspection or Testino performed Location of Inspection: See attached Field reports for Specific Areas Inspected or Tested. Results of Inspection: Project Complete Project Incomplete Fabrication Is: Erection Is: X In Compliance Non Compliance X Note: Workmanship type devia{ions noted dudng Inspection. which are being corrected at time of Inspection, are not being listed on Report. NOTE: Inspection was performed to vedfy compliance to Project specifications. Contract Documents. Drawings, and Governing Codes} AWS, AISC, ASTM. SJL, ASNT, ANSI Inspected By: Doug Post, AWSICertified Welding Inspector, ASNTICertified Level 2 (UT, MT) Distribution: DaI-Mac Construction - Damon/Norman City of Coppell - Larry Davis / Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore Doug Post STR-1 FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 NON - COMPLIANCE REPORT CLIENT: Coppell lSD c/o DaI-Mac Construction Co. DATE: January 14, 2000 PROJECT: Coppell High School, High School Expansion PROJECT NO: 0791-2208 REPORT NO: 13 PAGE 2 Number Description Location Deviate Corrective Action Taken From I Mislocation of bolt holes Area A, 2nd level Drawings Beam connection, angles have on beam to column been welded @ (3) places to 11/9199 connection, bolts could AM @ A5, A6 column flange. Corrections made not be installed per RFI 126 2 Mislocation of anchor Area H G 10 @ Drawings Corrections have been made per bolts on column base GH, attachment C RFI II1, except bolt spacing was 1 1/18/99 plate on RFI III moved 1 112 wider due to rebar in C.I.P floor. Depth of holes are in compliance. New bolt spacing is in compliance. RFI 130 3 Relocated beam due to Higher roof grid Drawings Welded beam connection angles at brick wall. Bolts not EA & ED @ E1 3 places to beam web (Need RFI) 1/14/00 installed in connection beam to beam web NOTE: Architect and Engineer should advise on acceptability of all noted deviations Inspected By: Doug Post, AWSICertJfied Welding Inspector, ASNTICe~fled Level 2 (UT, MT) STR-1 DalMac R.O. ~tz 830f~0. ~lr.~r~. ~ ?508~01~0. ~72-72~-3400 REQUEST FOR INFORMATION TO 'A .tOF 'AaES: REQUEST FOR DATE.- 1119199 INFORMATION#: 126 TQ: SHW GROUP, INC. ATTN: Dale IJllledahi CC: Mlcl(ey Harper PROJECT: CoPl~ell H. $. Additions FAX ~ 972-701-0799 PHONE tlc. 972-701-0700 and Renoval:lon~ PR OJEC T tk, 19922 · We re~3uest tiler you furnish the following information fits! is required by 11111199 please refer to the following documents: AttaGhed .REQUES"T: There is a rnisiocatio-n of bott holes on Beam to column connections at Area A, 2.ncr level (AM~A5.AS}, The bolts could not I=e installed. This deviates from the drawings. The beam connection angles have been welded to me column flbnge. Please advise. We need to know if we need to do anything else to this area by Thursday, Nov. 11, 1999 for ~fle deck pour on Fdday morning. The welded co~mectiona are on b'te East side of Columns (AM,AS) & (AM.A6). 'REQUESTED BY: John Mort:jan Pt'oie¢~ ~nqineer OaiMac ~e oni.v DalMac C~on C~ ~m~ no ~ or im~ ~tial~ tot ~e iM~don ou~ in ~ ~men~ ~i~ ~d ve~non for c~e ~mp~ance and ad~W ~ design s~all ~r. Steel RESPONSE: ~File: John Morgan The 2!' lonq Dy 3116" fillet weld on ea~ of ~e 2 angles of eac~ of ~e ~o ~0~0 beams soannin~ bemoan gdds AM and AP. and alon~ grids ~ and A6. COPY:I Damon Norman I IDon Ivy IWilson I I Ric~ Wodey ! IScott Harden BY: Dale Leil.iedehl OATE: 11112/991 J Mickev Harl3er REMITTO: John Morgan FAX NUMBER: 972-745-7593 I I Bre{t Rothwell DalMac ~EQUEST FOR INFORMATION '- TOTAL # OF PAGES: I. 2 REQUEST FOR )A/'E:' 11117199 INFORMA I'ION ~: 130 ' /'O: SHW GROUP. INC. tTTN: Date Liiqedatd CC: Mickey Har0er PROJECT: Col;Ua# H. S. A~ldillofls =AX ~. 972-70.1.0799 PHONE ~. 972-701-0700 and Ranovall~,m PROJECT ~ lg~2 We r~quest that you furnisll the following information that is required by 11122J99 please refer to the followiflg documenl=: Attached, RF! # 1 REQUEST: Two of the four anchor bolts that are located in area 'G' on column lines (GH,G10) cnuicI not I~e uMcad per RFI # 111. When I~mainninq to drill Ills holes for the epoxy anchor bolts, the two anchor bolts I~at were to the West of column line GH hit the reinforcir~ steel that was placed in the c~ncrete. They moved the holes over to the Wast and drilled two mom holes and succeeded whibmut hittlr~j any rebar. The new location for the Northwest anchor bolt is I 1/2' West of where it was orlcjinally i~lanad Der RF! # 111. This places the center of the bolt hole 2' away from the side of the c~ncrete bloct~ out. The new location for the Southwest anchor bolt is 1 114' West and 1/8' South of the originally planned location gar RFI # 111. This ;)laces the center of the hole 2 1/8' away fr~m the side of the c~ncrete [=lock out. The concrete blocd~ out for the base ola[e is not oerfac*Jy square. Please review the dimensions and please confirm if the location of these anchor Dolt/am acceptable. you have any_ Questions a~out this situation ,lease contact me ~ 972-745-3802. qEQUESTED BY'. John Morgan Proiect Engineer )~Mc ~ Camplny ~t.lml~ no ~ ~ tin,did respeflsil~ilffy for tfte inf~rn~rt CC: udined in lttll aacurtter~ Revi~ and vafiflgalJott for c:~. ;=ml~liaAce anal aeKlu~y of ~Wg~ ~a, Alpha .-:-.~. i i-- Z~ rESPONSE: F[le: John Morcjan Yes, this is COPY: Damon Norman -- Don Ivy Wltson Sparks/ Ric~ Wodey I Scott Harden (: David Kmmer DATE: 11/23/991 !Mir, kev Hamer =-MIT TO: John Morgan FAX NUMBER: 972-745-7593 I 18felt Rothwell FUGRO SOUTH, lNG. 2J80 V'~o IJne; OilIIL Texas 7522g FIELD ERECTION- MEMBERS INSPECTED or TESTED CLIENT: REPORT NO: ry~ of Insert Lou.ofl ! ~ I Non C~ Gauge ~ ~ ~ Inspected By: Doug Post. AW$/Ce~fled WeKiing Inspector. A~NT/~emfled Level 2 JUT, STR-3 FUGRO SOUTH, INC. Ph (9?2) 4~4.4301: I~x (9?2) FIELD ERECTION - MEMBERS INSPECTED or TESTED REPORT NO: /, Y PAGE I ~eck WeJders O~~ F Ch~ Size Qf W~ ~ ~ Mag =a~e T~ng of Wel~ InspeC~e~ By: Doug Post. A~/Ce~fi~ Welding ]~ape~r, A~T/Ce~ed Level 2 (UT. STR-2