Loading...
SC-Coppell HS-LR000107FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas. Texas 75;229 Ph (972) 484-8301; Fax (972) 620-7328 STRUCTURAL STEEL INSPECTION REPORT CLIENT: Coppell lSD c/o DaI-Mac Construction Co. DATE: January 7, 2000 PROJECT: Coppell High School, High School Expansion PROJECT NO: 0791-2208 REPORT NO: 12 PAGE 1 Owner: Coppell lSD Architect: SHW Group Engineer: SHW Group Contractor: DaI-Mac Construction Co. Fabricator: Alpha Industries Location of Project: Coppell, Texas Inspection Performed At: Job Site X Fabrication Shop DESCRIPTION OF INSPECTION: Structural Steel Inspection } Visual Inspection of Welds on (Str I Steel - Metal Deck Units) or Ultrasonic Testing or Magnetic Particle Inspection of Welds and Inspection of Bolted Connections for compliance to Project specifications, Contract Documents, Drawings, and Governing Codes } AWS, AISC, ASTM, SJI, ASNT, ANSI. See attached Field Reports for S~3ecific Items Inspected or Tested and TYDe of Inspection or Testing oerformed Location of Inspection: See attached Field reports for Specific Areas Inspected or Tested. Results of Inspection: Project Complete Project Incomplete Fabrication Is: Erection Is: X In Compliance X Non Compliance Note: Workmanship type deviations noted during Inspection, which are being corrected at time of Inspection, are not being listed on Report. NOTE: Inspection was performed to verify compliance to Project specifications, Contract Documents, Drawings, and Governing Codes} AWS, AISC, ASTM, SJL, ASNT, ANSI Inspected By: Doug Post, AWS/Certified Welding Inspector, ASNT/Certified Level 2 (UT, MT) Distribution: DaI-Mac Construction - Dam/on Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford Doug Post STR-1 FUGRO SOUTH, INC. ~ 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 NON - COMPLIANCE REPORT CLIENT: Coppell lSD cio DaI-Mac Construction Co. DATE: January 7, 2000 PROJECT: Coppell High School, High School Expansion PROJECT NO: 0791-2208 REPORT NO: 12 PAGE 2 Number Description Location Deviate Corrective Action Taken From 1 Mislocation of bolt holes Area A, 2nd level Drawings Beam connection, angles have on beam to column been welded @ (3) places to 11/9/99 connection, bolts could AM @ A5, A6 column flange. (No RFI) not be installed 2 Mislocation of anchor Area H G 10 @ Drawings Corrections have been made per bolts on column base GH, attachment C RFI III, except bolt spacing was 11/18/99 plate on RFI III moved 1 1/2 wider due to rebar in C.I.P floor. Depth of holes are in compliance. New RFI has been submitted by DaI-Mac showing a change in bolt pattern width. NOTE: Architect and Engineer should advise on acceptability of all noted deviations Inspected By: Doug Post, AWS/Certifled Welding Inspector, ASNT/CertJfied Level 2 (UT, MT) STP-1 FUGRO SOUTH, INC. ' 2880 Virgo Lane; Dallas. Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 FIELD ERECTION- MEMBERS INSPECTED or TESTED CLIENT: '~-.=,,"'-;: .=',: ' :" '" ;- - - · ..~,: ~ DATE: ~ "'-~"~'--:-.':~ PROJECT: - ..~ .~. ,~ F...': ti., .'.~,.'. ~:~. '-:~,,., ' PROJECT NO: o ?ql- REPORT NO: 0 ~ /,2. PAGE,~ OF Type of Inspection i location I In i Non Compliance: Compliance Check Bo~t Tightening Procedure ! I Check Connection for Required No. of Bolts Check Bolt Tightness with Torque Wrench Visual Inspection of Tension Control Bolts Beadng Bolted Connections / Snug Tight I Check Bolted Connection / Turn of Nut Check Gap on Loaded Indicator Washers Check Size. Length, and No. of Shear Studs Check Gauge of Composite Deck Checx Gauge of Roof Deck Check Size LaD Connec'Jon on Composite Deck CheCk Size La~ on Roof Deck Check Installation of Bridging on Joists / Girders Check Installation of -~xpansion Anc.hors I Re.co~ hand w,dtten at ~me of inspec?ion by Fiei~ Inspector ~' in box = In ccmpliance Reoo~. will ~e subm~t'.ed as is and net typed X in box =Ncn compliance } See Ncncc, moliance Inspected By: Doug Post, AWS;Cer'Jfied Welding ~ns~,ec:c:. ASNT/Ce.m.'fieC Level 2 ,U,. MT) S-~-3 FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (g72) 484-8301: Fax (g72) 620-7328 FIELD ERECTION - MEMBERS INSPECTED or TESTED REPORT NO: /' /22--. PAGE /-7~'' OF ~--/' Type of Inspection Location In Non Compliance Comloliance Che~ size and Projeclion of Anchor Bolt Check Anchor Bolt Group ~heck Nuts on Anc.ho~ Bolts I Tight Check ErectJon Procedures Check for Damaged Members Check Welde;s Qualification Records Check Fit-Up of Welde~ Connections visual Quality of Welds on Joists / Gi~ers Visual Oualit'/of Welds on Misc Steel visual Quality of Welds on Pre Cast Connection 'liscal Quality of Welds on Composite Deck '.'isa, a, ~ua~ity of Welds on Shear S~ds I Chec. J< Size of Welds on Joists / Girders ,{ i Check Size of Welds on Misc Steel J I Check Size of Welds on Pre Cast Connection , C.~eck Size of ',/Velds on Composite / R6~f ~?.~. = ~" ' ~.,.e.x Size of We[ds on Shear S[uds Jltrasonic Tes~.mg of We!ds " ,Ma~ ;=article Testing of Welds '~/~' =[=.=c.'. har~d ,vritten al :~rne of ~ns;)ec,~on ~)y Field Inspector ~' in box = ~n compliance c~.=;c~ ,vfll :e s~O,m, itteC as .s and not ~Ded X ~n ~3cx = Non compliance } See Non com~,hance'.cc.= "'. Ins.oected 5~y: Doug Post, AWS, Ce~ified Welc!ing !n$cector. ASNT:Ce~i.".eC Leve! 2 (UT. ST;t-2