Loading...
SC-Coppell HS-LR 991230FUGRO SOUTH, INC. ~ 2880 Virgo Lane; Dallas, Texas 7522g Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: December 30, 1999 PROJECT: Coppell High School, Coppell, Texas Project No.: 0791-2208 SAMPLE DATE: November 19, 1999 CONTRACTOR: The Cortez Group TICKET NO.: 3095271 CONCRETE SUPPLIER: Lattimore Materials AMBIENT TEMP. (°F): 77 PLANT/TRUCK: 3/1046 CONCRETE TEMP. (°F) (ASTM C-1064): 70 MIX ID NUMBER: 42 TIME BATCHED: 7:52 AIR (%) (ASTM C-231): TIME SAMPLED: 8:30 WATER ADDED (gal): 7 WEATHER CONDITION: Clear SLUMP (in.) (ASTM C-143): 5 1/4 LOCATION OF PLACEMENT: Slab on raised deck on Building B on grid lines B2.5 and BP, CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYUNDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 396 7 11/26/99 78000 2760 3000/28 days CHC 397 28 12/17/99 90000 3180 CHC 398 28 12/17/99 94000 3330 CHC 399 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143. Typesof [~ [~ ~ D Curing; Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: Frank Daniel FUGRO SOUTH INC. P,eviewed By: SMH/rm Distribution: Dal-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford